← Foresight Energy Labor LLC

Foresight Energy Labor LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9786593
    MC#1 Mine · 1103189

    30 CFR 75.1731(a) · $209.00 proposed penalty

  2. Handling of materials

    accidentRecord 220253170605
    Mach #1 Mine · 1103141

    Days away from work only

    Accident narrative

    I.E. was helping carry water pipe when the person who was carrying the other end suddenly dropped their end causing I.E. to drop their end of the pipe on their foot.

  3. Spot Inspections

    inspectionRecord F009D0E
    Mach #1 Mine · 1103141

    103(i) · 6.5 on-site hours reported

  4. Spot Inspections

    inspectionRecord F00BE11
    Deer Run Mine · 1103182

    103(i) · 4.8 on-site hours reported

  5. Electric equipment; examination, testing and maintenance.

    violationRecord 9787000
    Mach #1 Mine · 1103141

    30 CFR 75.512 · Significant and substantial (S&S) · $6,037.00 proposed penalty

  6. High-voltage underground equipment; grounding.

    violationRecord 9786592
    MC#1 Mine · 1103189

    30 CFR 75.811 · $642.00 proposed penalty

  7. Other safeguards.

    violationRecord 9786591
    MC#1 Mine · 1103189

    30 CFR 75.1403 · $193.00 proposed penalty

  8. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9786590
    MC#1 Mine · 1103189

    30 CFR 75.1731(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  9. Deenergization of self-propelled electric face equipment; performance requirements.

    violationRecord 5012035
    MC#1 Mine · 1103189

    30 CFR 75.523-2(c) · Significant and substantial (S&S) · $959.00 proposed penalty

  10. Escapeways; bituminous and lignite mines.

    violationRecord 5012034
    MC#1 Mine · 1103189

    30 CFR 75.380(f)(3)(iii) · $209.00 proposed penalty

  11. Powered haulage

    accidentRecord 220253170587
    Mach #1 Mine · 1103141

    Days away from work only

    Accident narrative

    I.E. was hauling bolting materials up to the face to load bolters. While tramming, T-3 channel that they loaded on the scoop came loose and entered the cab striking them in their left shoulder.

  12. Mine ventilation plan; submission and approval.

    violationRecord 5016103
    MC#1 Mine · 1103189

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  13. Fall of roof or back

    accidentRecord 220253170576
    Deer Run Mine · 1103182

    Accident only

    Accident narrative

    An unplanned roof fall occurred in entry #3 in the intersection of 79 in HG 8.

  14. Non-Injury Accident Investigation

    inspectionRecord F00BE10
    Deer Run Mine · 1103182

    11.8 on-site hours reported

  15. Violation — cited standard not reported

    violationRecord 9781482
    Deer Run Mine · 1103182
  16. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 9786589
    MC#1 Mine · 1103189

    30 CFR 75.1909(a)(8) · $209.00 proposed penalty

  17. Methane monitors.

    violationRecord 5012033
    MC#1 Mine · 1103189

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  18. Spot Inspections

    inspectionRecord F00BE0F
    Deer Run Mine · 1103182

    103(i) · 7.0 on-site hours reported

  19. Spot Inspections

    inspectionRecord 7023090
    MC#1 Mine · 1103189

    103(i) · 6.0 on-site hours reported

  20. Maintenance of incombustible content of rock dust.

    violationRecord 9786999
    Mach #1 Mine · 1103141

    30 CFR 75.403 · $245.00 proposed penalty

  21. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 9786998
    Mach #1 Mine · 1103141

    30 CFR 75.1909(b)(5) · $245.00 proposed penalty

  22. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 9786997
    Mach #1 Mine · 1103141

    30 CFR 75.1911(i) · $245.00 proposed penalty

  23. Mine ventilation plan; submission and approval.

    violationRecord 9781728
    Deer Run Mine · 1103182

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  24. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5016102
    MC#1 Mine · 1103189

    30 CFR 75.1731(a) · $209.00 proposed penalty

  25. Machinery and equipment; operation and maintenance.

    violationRecord 5016101
    MC#1 Mine · 1103189

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $959.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.