Foresight Energy Labor LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
On-shift examination.
MC#1 Mine · 110318930 CFR 75.362(d)(3)(ii) · Significant and substantial (S&S) · $465.00 proposed penalty
Spot Inspections
MC#1 Mine · 1103189103(i) · 7.0 on-site hours reported
Power wires and cables; insulation and protection.
Mach #1 Mine · 110314130 CFR 75.517 · Significant and substantial (S&S) · $3,736.00 proposed penalty
Protection of trailing cables.
Mach #1 Mine · 110314130 CFR 75.606 · $642.00 proposed penalty
Protection from falls of roof, face and ribs.
MC#1 Mine · 110318930 CFR 75.202(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Spot Inspections
Mach #1 Mine · 1103141103(i) · 7.0 on-site hours reported
Cable fittings; suitability.
Mach #1 Mine · 110314130 CFR 75.515 · $193.00 proposed penalty
Atmospheric monitoring systems.
Mach #1 Mine · 110314130 CFR 75.351(d)(2) · $193.00 proposed penalty
Underground electrical installations.
Mach #1 Mine · 110314130 CFR 75.340(a)(2)(i) · $193.00 proposed penalty
Ventilation controls.
Mach #1 Mine · 110314130 CFR 75.333(c)(1) · $193.00 proposed penalty
Mine ventilation plan; submission and approval.
Mach #1 Mine · 110314130 CFR 75.370(a)(1) · $313.00 proposed penalty
Air quantity.
Mach #1 Mine · 110314130 CFR 75.325(f) · $193.00 proposed penalty
Water, sediment, or slurry impoundments and impounding structures; general.
Deer Run Mine · 110318230 CFR 77.216(d) · $2,712.00 proposed penalty
Electric equipment; examination, testing and maintenance.
MC#1 Mine · 110318930 CFR 75.512 · $697.00 proposed penalty
Electric equipment; examination, testing and maintenance.
MC#1 Mine · 110318930 CFR 75.512 · Significant and substantial (S&S) · $1,550.00 proposed penalty
Other
Deer Run Mine · 1103182Days away from work only
Accident narrative
Employee was walking down stairs. Felt a pop in their left knee.
Spot Inspections
MC#1 Mine · 1103189103(i) · 7.0 on-site hours reported
On-shift examination.
Mach #1 Mine · 110314130 CFR 75.362(d)(3)(ii) · $209.00 proposed penalty
On-shift examination.
Mach #1 Mine · 110314130 CFR 75.362(d)(3)(ii) · $209.00 proposed penalty
Mine ventilation plan; submission and approval.
Mach #1 Mine · 110314130 CFR 75.370(a)(1) · $151.00 proposed penalty
Protection of trailing cables.
MC#1 Mine · 110318930 CFR 75.606 · $288.00 proposed penalty
Methane monitors.
MC#1 Mine · 110318930 CFR 75.342(a)(4) · $151.00 proposed penalty
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · $336.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MC#1 Mine · 110318930 CFR 75.1731(a) · $245.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MC#1 Mine · 110318930 CFR 75.1731(b) · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.