Foresight Energy Labor LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Underground diesel fuel storage—general requirements.
MC#1 Mine · 110318930 CFR 75.1902(d)(2) · $209.00 proposed penalty
Other safeguards.
MC#1 Mine · 110318930 CFR 75.1403 · Significant and substantial (S&S) · $1,037.00 proposed penalty
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $366.00 proposed penalty
Spot Inspections
Deer Run Mine · 1103182103(i) · 7.5 on-site hours reported
Maintenance of incombustible content of rock dust.
Mach #1 Mine · 110314130 CFR 75.403 · $151.00 proposed penalty
Spot Inspections
MC#1 Mine · 1103189103(i) · 7.0 on-site hours reported
Preshift examination at fixed intervals.
Mach #1 Mine · 110314130 CFR 75.360(b)(6)(ii) · $642.00 proposed penalty
Fire suppression systems for diesel-powered equipment and fuel transportation units.
MC#1 Mine · 110318930 CFR 75.1911(i) · $151.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
MC#1 Mine · 110318930 CFR 75.1909(a)(3)(iv) · $193.00 proposed penalty
Permissible electric face equipment; maintenance.
MC#1 Mine · 110318930 CFR 75.503 · Significant and substantial (S&S) · $1,320.00 proposed penalty
Spot Inspections
Mach #1 Mine · 1103141103(i) · 6.5 on-site hours reported
Nonpermissible diesel-powered equipment; design and performance requirements.
Mach #1 Mine · 110314130 CFR 75.1909(d) · $193.00 proposed penalty
Other safeguards.
Deer Run Mine · 110318230 CFR 75.1403
Protective clothing; requirements.
Deer Run Mine · 110318230 CFR 77.1710(h) · $642.00 proposed penalty
Maintenance of diesel-powered equipment.
Deer Run Mine · 110318230 CFR 75.1914(a) · $209.00 proposed penalty
Violation — cited standard not reported
Deer Run Mine · 1103182$642.00 proposed penalty
Electric equipment; examination, testing and maintenance.
MC#1 Mine · 110318930 CFR 75.512 · $193.00 proposed penalty
Verbal Hazard Complaint Inspections
Mach #1 Mine · 11031411.5 on-site hours reported
Protective clothing; requirements.
Deer Run Mine · 110318230 CFR 75.1720(c) · Significant and substantial (S&S) · $26,139.00 proposed penalty
Training of miners assigned to a task in which they have had no previous experience; minimum courses of instruction.
Deer Run Mine · 110318230 CFR 48.7(c) · Significant and substantial (S&S) · $33,227.00 proposed penalty
Breaking trailing cable and power cable connections.
Deer Run Mine · 110318230 CFR 75.607 · Significant and substantial (S&S) · $26,139.00 proposed penalty
Low-, medium-, or high-voltage distribution circuits and equipment; repair.
Deer Run Mine · 110318230 CFR 75.511 · Significant and substantial (S&S) · $90,649.00 proposed penalty
Investigation.
Deer Run Mine · 110318230 CFR 50.11(b) · $432.00 proposed penalty
Immediate notification.
Deer Run Mine · 110318230 CFR 50.10(d) · $2,133.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Deer Run Mine · 110318230 CFR 75.1731(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.