Foresight Energy Labor LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MC#1 Mine · 110318930 CFR 75.1731(b) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Criteria—Belt conveyors.
MC#1 Mine · 110318930 CFR 75.1403-5(g) · $245.00 proposed penalty
Communications facilities; refuge alternatives.
Mach #1 Mine · 110314130 CFR 75.1600-3(a)(2) · $398.00 proposed penalty
Ventilation controls.
MC#1 Mine · 110318930 CFR 75.333(h) · $288.00 proposed penalty
Handtools (nonpowered)
Deer Run Mine · 1103182No dys awy frm wrk,no rstr act
Accident narrative
IE was putting a come along on the Shear and smashed EE's index finger. IE received 4 sutures.
Spot Inspections
Mach #1 Mine · 1103141103(i) · 6.3 on-site hours reported
Spot Inspections
MC#1 Mine · 1103189103(i) · 5.0 on-site hours reported
Mine ventilation plan; submission and approval.
Mach #1 Mine · 110314130 CFR 75.370(a)(1) · $366.00 proposed penalty
Handling of materials
Mach #1 Mine · 1103141Days away from work only
Accident narrative
I.E. was helping drag cables when they stepped on a rock and the cable being drug tripped them up and they fell on their knee.
Shaft, Slope or Major Construction Spot Inspection
Mach #1 Mine · 11031412.0 on-site hours reported
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $366.00 proposed penalty
Machinery and equipment; operation and maintenance.
Mach #1 Mine · 110314130 CFR 77.404(c) · Significant and substantial (S&S)
Flammable liquids; storage.
Mach #1 Mine · 110314130 CFR 77.1103(d) · $193.00 proposed penalty
Explosives; magazines.
Mach #1 Mine · 110314130 CFR 77.1301(c)(11) · $193.00 proposed penalty
Explosives, handling and use.
Mach #1 Mine · 110314130 CFR 77.1303(d) · $642.00 proposed penalty
Mine ventilation plan; submission and approval.
MC#1 Mine · 110318930 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Spot Inspections
MC#1 Mine · 1103189103(i) · 11.0 on-site hours reported
Belt air course ventilation.
Mach #1 Mine · 110314130 CFR 75.350(a)(2) · $193.00 proposed penalty
Machinery and equipment; operation and maintenance.
MC#1 Mine · 110318930 CFR 75.1725(a) · $245.00 proposed penalty
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Ventilation controls.
MC#1 Mine · 110318930 CFR 75.333(c) · $245.00 proposed penalty
Slip or fall of person
Mach #1 Mine · 1103141Days away from work only
Accident narrative
I.E. was carrying an air tank to the face when EE slipped on shield #2 and the tank fell on EE's finger.
Fire suppression systems for diesel-powered equipment and fuel transportation units.
Mach #1 Mine · 110314130 CFR 75.1911(i) · $151.00 proposed penalty
Weekly examination.
Mach #1 Mine · 110314130 CFR 75.364(b)(8)(ii) · $697.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.