← Ferroglobe PLC

Ferroglobe PLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Inspection and cover plates.

    violationRecord 5081623
    Alden Resources Harps Creek · 1518466

    30 CFR 77.512 · $151.00 proposed penalty

  2. Electrical connections or splices; suitability.

    violationRecord 5081622
    Alden Resources Harps Creek · 1518466

    30 CFR 77.504 · $151.00 proposed penalty

  3. Examination of working places.

    violationRecord 5193044
    Marlboro Mine · 3800768

    30 CFR 56.18002(b) · $151.00 proposed penalty

  4. Horns and backup alarms.

    violationRecord 5193043
    Marlboro Mine · 3800768

    30 CFR 56.14132(a) · $883.00 proposed penalty

  5. Safety defects; examination, correction and records.

    violationRecord 5193042
    Marlboro Mine · 3800768

    30 CFR 56.14100(b) · $883.00 proposed penalty

  6. Brakes.

    violationRecord 5193041
    Marlboro Mine · 3800768

    30 CFR 56.14101(a)(2) · $883.00 proposed penalty

  7. Horns and backup alarms.

    violationRecord 5193040
    Marlboro Mine · 3800768

    30 CFR 56.14132(b)(1)(i) · $883.00 proposed penalty

  8. Safety defects; examination, correction and records.

    violationRecord 5193039
    Marlboro Mine · 3800768

    30 CFR 56.14100(b) · $267.00 proposed penalty

  9. Verbal Hazard Complaint Inspections

    inspectionRecord F0444E7
    Marlboro Mine · 3800768

    7.8 on-site hours reported

  10. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F0444E8
    Marlboro Mine · 3800768

    1.0 on-site hours reported

  11. Regular Safety and Health Inspection

    inspectionRecord F0444E9
    Marlboro Mine · 3800768

    4.8 on-site hours reported

  12. New task training.

    violationRecord 5193038
    Marlboro Mine · 3800768

    30 CFR 46.7(a) · $267.00 proposed penalty

  13. Safety can use.

    violationRecord 5193037
    Marlboro Mine · 3800768

    30 CFR 56.4402 · $151.00 proposed penalty

  14. Inspection.

    violationRecord 5193036
    Marlboro Mine · 3800768

    30 CFR 56.4201(a)(2) · $267.00 proposed penalty

  15. Safety defects; examination, correction and records.

    violationRecord 5193035
    Marlboro Mine · 3800768

    30 CFR 56.14100(a) · $883.00 proposed penalty

  16. Safety defects; examination, correction and records.

    violationRecord 5193034
    Marlboro Mine · 3800768

    30 CFR 56.14100(b) · $883.00 proposed penalty

  17. Eye protection.

    violationRecord 5193033
    Marlboro Mine · 3800768

    30 CFR 56.15004 · Significant and substantial (S&S) · $1,320.00 proposed penalty

  18. Drill dust control at underground areas of underground mines.

    violationRecord 3794094
    Alden Resources Harps Creek · 1518466

    30 CFR 72.630(b) · Significant and substantial (S&S) · $288.00 proposed penalty

  19. Protection from falls of roof, face and ribs.

    violationRecord 3794093
    Alden Resources Harps Creek · 1518466

    30 CFR 75.202(a) · Significant and substantial (S&S) · $177.00 proposed penalty

  20. Mining methods.

    violationRecord 3794092
    Alden Resources Harps Creek · 1518466

    30 CFR 75.203(a) · $151.00 proposed penalty

  21. Ventilation controls.

    violationRecord 3794091
    Alden Resources Harps Creek · 1518466

    30 CFR 75.333(b)(1) · $151.00 proposed penalty

  22. Identification of circuit breakers and disconnecting switches.

    violationRecord 3794090
    Alden Resources Harps Creek · 1518466

    30 CFR 77.809 · $151.00 proposed penalty

  23. Electric equipment; examination, testing and maintenance.

    violationRecord 3794089
    Alden Resources Harps Creek · 1518466

    30 CFR 75.512 · $151.00 proposed penalty

  24. Electric wiring and equipment; installation and maintenance.

    violationRecord 7511669
    Gatliff Tipple · 1509938

    30 CFR 77.516 · $151.00 proposed penalty

  25. Travelways at surface installations.

    violationRecord 7511668
    Gatliff Tipple · 1509938

    30 CFR 77.205(a) · Significant and substantial (S&S) · $193.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.