FEG III Spousal Trust; Francis E Gardiner III 2017 Irrevocable Trust eta safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Compliance Follow-up Inspection
Bridgetown Sand & Gravel · 18008071.0 on-site hours reported
Examination of working places.
Bridgetown Sand & Gravel · 180080730 CFR 56.18002(d) · $151.00 proposed penalty
Regular Safety and Health Inspection
Bridgetown Sand & Gravel · 18008076.5 on-site hours reported
Annual refresher training.
FAULKNER SITE · 180081030 CFR 46.8(a)(2) · $168.00 proposed penalty
Berms or guardrails.
FAULKNER SITE · 180081030 CFR 56.9300(b) · Significant and substantial (S&S) · $193.00 proposed penalty
Regular Safety and Health Inspection
FAULKNER SITE · 180081013.3 on-site hours reported
Compliance Follow-up Inspection
Bridgetown Sand & Gravel · 18008070.0 on-site hours reported
Self-propelled equipment.
Bridgetown Sand & Gravel · 180080730 CFR 56.4230(a)(1) · $151.00 proposed penalty
Horns and backup alarms.
Bridgetown Sand & Gravel · 180080730 CFR 56.14132(b)(1)(i) · $151.00 proposed penalty
Brakes.
Bridgetown Sand & Gravel · 180080730 CFR 56.14101(a)(3) · $151.00 proposed penalty
Moving machine parts.
Bridgetown Sand & Gravel · 180080730 CFR 56.14107(a) · $151.00 proposed penalty
Berms or guardrails.
Bridgetown Sand & Gravel · 180080730 CFR 56.9300(b) · $151.00 proposed penalty
Self-propelled equipment.
Bridgetown Sand & Gravel · 180080730 CFR 56.4230(a) · $151.00 proposed penalty
Moving machine parts.
Bridgetown Sand & Gravel · 180080730 CFR 56.14107(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Bridgetown Sand & Gravel · 180080712.3 on-site hours reported
Regular Safety and Health Inspection
FAULKNER SITE · 18008106.5 on-site hours reported
Brakes.
FAULKNER SITE · 180081030 CFR 56.14101(a)(2) · $151.00 proposed penalty
Regular Safety and Health Inspection
FAULKNER SITE · 18008103.8 on-site hours reported
Identification of power switches.
FAULKNER SITE · 180081030 CFR 56.12018 · $151.00 proposed penalty
Compliance Follow-up Inspection
Bridgetown Sand & Gravel · 18008070.0 on-site hours reported
Action level.
Bridgetown Sand & Gravel · 180080730 CFR 62.120 · $151.00 proposed penalty
Regular Safety and Health Inspection
Bridgetown Sand & Gravel · 180080714.5 on-site hours reported
Protective equipment and clothing for hazards and irritants.
Bridgetown Sand & Gravel · 180080730 CFR 56.15006 · Significant and substantial (S&S) · $151.00 proposed penalty
Access to stationary electrical equipment or switchgear.
Bridgetown Sand & Gravel · 180080730 CFR 56.12019 · $151.00 proposed penalty
Berms or guardrails.
Bridgetown Sand & Gravel · 180080730 CFR 56.9300(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.