Edward A Asbury safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Respirable dust control plan; approval by District Manager and posting.
Skyway III Mine · 460948030 CFR 71.301(c) · $151.00 proposed penalty
Accumulations of combustible materials.
Skyway III Mine · 460948030 CFR 77.1104 · $151.00 proposed penalty
Flammable liquids; storage.
Skyway III Mine · 460948030 CFR 77.1103(a) · $151.00 proposed penalty
Storage of materials.
Skyway III Mine · 460948030 CFR 77.208(d) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
No 1 · 460736630 CFR 75.512 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Requirement for container labels.
Skyway III Mine · 460948030 CFR 47.41(a)(1) · $151.00 proposed penalty
Examination and maintenance of firefighting equipment.
Skyway III Mine · 460948030 CFR 77.1110 · $151.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
Skyway III Mine · 460948030 CFR 77.701 · $151.00 proposed penalty
Highwalls, pits and spoil banks; plans.
Skyway III Mine · 460948030 CFR 77.1000 · $151.00 proposed penalty
Short circuit protection of trailing cables.
No 1 · 460736630 CFR 75.601 · $336.00 proposed penalty
Electric equipment; examination, testing and maintenance.
No 1 · 460736630 CFR 75.512 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
No 1 · 460736630 CFR 75.512 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
No 1 · 460736630 CFR 75.512 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
No 1 · 460736630 CFR 75.512 · $151.00 proposed penalty
Ventilation controls.
No 1 · 460736630 CFR 75.333(d)(3) · $151.00 proposed penalty
Accumulations of combustible materials.
Skyway III Mine · 460948030 CFR 77.1104 · Significant and substantial (S&S) · $288.00 proposed penalty
Machinery and equipment; operation and maintenance.
Skyway III Mine · 460948030 CFR 77.404(a) · $959.00 proposed penalty
Mechanical equipment guards.
Skyway III Mine · 460948030 CFR 77.400(d) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Skyway III Mine · 460948030 CFR 77.404(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Regular Safety and Health Inspection
Superior Cleaning Plant · 460330321.3 on-site hours reported
Regular Safety and Health Inspection
Skyway III Mine · 460948082.3 on-site hours reported
Loading and haulage equipment; inspection and maintenance.
Superior Cleaning Plant · 460330330 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Superior Cleaning Plant · 460330330 CFR 77.1606(c) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Skyway III Mine · 460948030 CFR 77.404(a) · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
Sewell Mine B · 46062655.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.