Edward A Asbury safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
Mine No. 1 · 460858130 CFR 75.400 · Significant and substantial (S&S)
Machinery and equipment; operation and maintenance.
Mine No. 1 · 460858130 CFR 75.1725(a) · Significant and substantial (S&S)
Machinery and equipment; operation and maintenance.
Mine No. 1 · 460858130 CFR 75.1725(a) · Significant and substantial (S&S)
Inspection of fire suppression devices.
Mine No. 1 · 460858130 CFR 75.1107-16(b)
Machinery and equipment; operation and maintenance.
Mine No. 1 · 460858130 CFR 75.1725(a) · Significant and substantial (S&S)
Regular Safety and Health Inspection
Mine No. 1 · 46085815.5 on-site hours reported
Status change reports.
Mine No. 1 · 460858130 CFR 70.212(a)
Deenergized underground power circuits; idle days—idle shifts.
Mine No. 1 · 460858130 CFR 75.706
Mine ventilation plan; submission and approval.
Mine No. 1 · 460858130 CFR 75.370(a)(1)
Regular Safety and Health Inspection
No 1 · 460736612.0 on-site hours reported
Automatic fire warning devices; actions and response.
Sewell Mine B · 460626530 CFR 75.1103-5(a)(1)
Escapeways; bituminous and lignite mines.
Sewell Mine B · 460626530 CFR 75.380(d)(1)
Grounding metallic frames, casings, and other enclosures of electric equipment.
Sewell Mine B · 460626530 CFR 75.701
Maintenance of belt conveyors and belt conveyor entries.
Sewell Mine B · 460626530 CFR 75.1731(b)
Maintenance of belt conveyors and belt conveyor entries.
Sewell Mine B · 460626530 CFR 75.1731(a)
Automatic fire sensor and warning device systems; examination and test requirements.
Sewell Mine B · 460626530 CFR 75.1103-8(c)
Loading and haulage equipment; inspection and maintenance.
Skyway III Mine · 460948030 CFR 77.1606(c)
Loading and haulage equipment; installations.
Skyway III Mine · 460948030 CFR 77.1605(d)
Regular Safety and Health Inspection
Skyway III Mine · 460948020.5 on-site hours reported
Loading and haulage equipment; installations.
Sewell Mine B · 460626530 CFR 77.1605(d) · $151.00 proposed penalty
Status change reports.
Skyway III Mine · 460948030 CFR 71.209(a)
Verbal Hazard Complaint Inspections
Sewell Mine B · 46062657.5 on-site hours reported
Approved sampling devices; maintenance and calibration.
Sewell Mine B · 460626530 CFR 70.204(a) · $151.00 proposed penalty
Sampling; general and technical requirements.
Sewell Mine B · 460626530 CFR 70.201(h) · $151.00 proposed penalty
Approved sampling devices; operation; air flowrate.
Sewell Mine B · 460626530 CFR 70.205(c) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.