Duane K McCoy safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Compliance Follow-up Inspection
Downy Property · 14018591.0 on-site hours reported
Regular Safety and Health Inspection
Downy Property · 14018592.3 on-site hours reported
Safety defects; examination, correction and records.
Downy Property · 140185930 CFR 56.14100(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
Pit #2 · 14018395.0 on-site hours reported
Testing grounding systems.
Pit #2 · 140183930 CFR 56.12028 · $151.00 proposed penalty
Testing grounding systems.
Pit #2 · 140183930 CFR 56.12028 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Pit #2 · 140183930 CFR 56.14100(b) · $151.00 proposed penalty
Inspection.
Pit #2 · 140183930 CFR 56.4201(a)(1) · $151.00 proposed penalty
Safety defects; examination, correction and records.
McCoy Mine · 140177030 CFR 56.14100(a) · $151.00 proposed penalty
Changes; notification by operator.
McCoy Mine · 140177030 CFR 41.12 · $151.00 proposed penalty
Regular Safety and Health Inspection
McCoy Mine · 140177010.8 on-site hours reported
Availability of an MSDS.
McCoy Mine · 140177030 CFR 47.54(a) · $151.00 proposed penalty
Operators stations.
McCoy Mine · 140177030 CFR 56.14103(b) · $151.00 proposed penalty
Testing grounding systems.
McCoy Mine · 140177030 CFR 56.12028 · $151.00 proposed penalty
Machinery, equipment, and tools.
McCoy Mine · 140177030 CFR 56.14205 · $151.00 proposed penalty
Horns and backup alarms.
McCoy Mine · 140177030 CFR 56.14132(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Downy Property · 14018592.0 on-site hours reported
Spot Inspection
McCoy Mine · 14017700.0 on-site hours reported
Regular Safety and Health Inspection
McCoy Mine · 14017704.0 on-site hours reported
Testing grounding systems.
McCoy Mine · 140177030 CFR 56.12028 · $151.00 proposed penalty
Examination of working places.
McCoy Mine · 140177030 CFR 56.18002(a) · $151.00 proposed penalty
Inspection.
McCoy Mine · 140177030 CFR 56.4201(a)(1) · $151.00 proposed penalty
Safety defects; examination, correction and records.
McCoy Mine · 140177030 CFR 56.14100(b) · $151.00 proposed penalty
Horns and backup alarms.
McCoy Mine · 140177030 CFR 56.14132(b)(1)(i) · $151.00 proposed penalty
Safety defects; examination, correction and records.
McCoy Mine · 140177030 CFR 56.14100(b) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.