← Dick Gilbert; John A Smith

Dick Gilbert; John A Smith safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Special Emphasis Programs

    inspectionRecord F02037F
    TRM Mine and Mill · 4202677

    0.3 on-site hours reported

  2. Special Emphasis Programs

    inspectionRecord F022E6C
    TRM Mill · 4202678

    0.3 on-site hours reported

  3. Regular Safety and Health Inspection

    inspectionRecord F022E6A
    TRM Mill · 4202678

    5.0 on-site hours reported

  4. Correction of dangerous conditions.

    violationRecord 5032048
    TRM Mine and Mill · 4202677

    30 CFR 57.12030 · $151.00 proposed penalty

  5. Escape routes.

    violationRecord 5032047
    TRM Mine and Mill · 4202677

    30 CFR 57.11051 · $151.00 proposed penalty

  6. Escape and evacuation plans.

    violationRecord 5032046
    TRM Mine and Mill · 4202677

    30 CFR 57.11053(a) · $151.00 proposed penalty

  7. Regular Safety and Health Inspection

    inspectionRecord 6790993
    TRM Mine and Mill · 4202677

    19.0 on-site hours reported

  8. Regular Safety and Health Inspection

    inspectionRecord F03302A
    TRM Mine and Mill · 4202677

    19.5 on-site hours reported

  9. Regular Safety and Health Inspection

    inspectionRecord F033023
    TRM Mine and Mill · 4202677

    9.5 on-site hours reported

  10. Regular Safety and Health Inspection

    inspectionRecord F033024
    TRM Mill · 4202678

    9.5 on-site hours reported

  11. Regular Safety and Health Inspection

    inspectionRecord F03AD98
    TRM Mine and Mill · 4202677

    24.0 on-site hours reported

  12. Regular Safety and Health Inspection

    inspectionRecord F03AD91
    TRM Mine and Mill · 4202677

    12.0 on-site hours reported

  13. Machinery

    accidentRecord 220251640014
    TRM Mine and Mill · 4202677

    No dys awy frm wrk,no rstr act

    Accident narrative

    Employee was mining underground with a pneumatic chipping hammer. The chipping hammer glanced off a rock causing the moil to puncture the employees right foot. Employee was treated with basic first aid on site and then transported to medical care.

  14. Regular Safety and Health Inspection

    inspectionRecord F022E4E
    TRM Mine and Mill · 4202677

    15.0 on-site hours reported

  15. Regular Safety and Health Inspection

    inspectionRecord 6790976
    TRM Mill · 4202678

    4.5 on-site hours reported

  16. Immediate notification.

    violationRecord 9826654
    TRM Mine and Mill · 4202677

    30 CFR 50.10(d) · $151.00 proposed penalty

  17. Hoisting

    accidentRecord 220250310007
    TRM Mine and Mill · 4202677

    Accident only

    Accident narrative

    The genset broke down on 01/23/2025. The hoist was inoperable while we were waiting for parts and a repair person. MSHA inspector arrived on site on 1/27/2025- citation was issued per above conditions. Table Rock Minerals was unaware that MSHA needed immediate notification. Genset was repaired on 1/29/2025- hoist is now operable.

  18. Regular Safety and Health Inspection

    inspectionRecord 6944290
    TRM Mine and Mill · 4202677

    8.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.