Regular Safety and Health Inspection
BLISSVILLE QUARRY & MILL · 430019612.0 on-site hours reported
Safety defects; examination, correction and records.
BLISSVILLE QUARRY & MILL · 430019630 CFR 56.14100(b) · $366.00 proposed penalty
New task training.
BLISSVILLE QUARRY & MILL · 430019630 CFR 46.7(c) · $273.00 proposed penalty
Moving machine parts.
BLISSVILLE QUARRY & MILL · 430019630 CFR 56.14107(a) · $151.00 proposed penalty
Construction and maintenance of guards.
BLISSVILLE QUARRY & MILL · 430019630 CFR 56.14112(a)(1) · $366.00 proposed penalty
Eye protection.
BLISSVILLE QUARRY & MILL · 430019630 CFR 56.15004 · Significant and substantial (S&S) · $818.00 proposed penalty
Electric substations and liquid storage facilities.
BLISSVILLE QUARRY & MILL · 430019630 CFR 56.4130(b) · $245.00 proposed penalty
Violation — cited standard not reported
BLISSVILLE QUARRY & MILL · 4300196$151.00 proposed penalty
Self-propelled equipment.
BLISSVILLE QUARRY & MILL · 430019630 CFR 56.4230(a)(1) · $245.00 proposed penalty
Self-propelled equipment.
BLISSVILLE QUARRY & MILL · 430019630 CFR 56.4230(a)(1) · $245.00 proposed penalty
Examination of working places.
BLISSVILLE QUARRY & MILL · 430019630 CFR 56.18002(b) · $245.00 proposed penalty
Regular Safety and Health Inspection
BLISSVILLE QUARRY & MILL · 430019613.3 on-site hours reported
Regular Safety and Health Inspection
WARREN SWITCH QUARRY · 430064613.0 on-site hours reported
Regular Safety and Health Inspection
WELLS QUARRY WELLS VT · 43005035.8 on-site hours reported
Testing grounding systems.
WELLS QUARRY WELLS VT · 430050330 CFR 56.12028 · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
WARREN SWITCH QUARRY · 430064630 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
WARREN SWITCH QUARRY · 430064630 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
WARREN SWITCH QUARRY · 430064630 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
WARREN SWITCH QUARRY · 430064630 CFR 50.30(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
WARREN SWITCH QUARRY · 43006465.5 on-site hours reported
Safety defects; examination, correction and records.
BLISSVILLE QUARRY & MILL · 430019630 CFR 56.14100(c) · Significant and substantial (S&S) · $549.00 proposed penalty
Examination of working places.
BLISSVILLE QUARRY & MILL · 430019630 CFR 56.18002(b) · $226.00 proposed penalty
Inspection.
BLISSVILLE QUARRY & MILL · 430019630 CFR 56.4201(b) · $151.00 proposed penalty
Horns and backup alarms.
WARREN SWITCH QUARRY · 430064630 CFR 56.14132(a) · $151.00 proposed penalty
High-pressure hose connections.
BLISSVILLE QUARRY & MILL · 430019630 CFR 56.13021 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.