Housekeeping.
Columbus Limestone · 330465730 CFR 56.20003(a) · Significant and substantial (S&S) · $465.00 proposed penalty
Housekeeping.
Columbus Limestone · 330465730 CFR 56.20003(a) · Significant and substantial (S&S) · $465.00 proposed penalty
Striking or bumping
Columbus Limestone · 3304657Days restricted activity only
Accident narrative
EE kicked frozen outrigger pad with right leg. EE initially felt no pain but 8-10 hours later, noticed some pain and swelling of the right knee. EE was accompanied by safety to an orthopedic clinic for exam the following day where they were prescribed steroids and given no lifting/pushing/pulling restrictions pending follow up.
Regular Safety and Health Inspection
Jenny Lind Quarry · 030042914.0 on-site hours reported
Compliance Follow-up Inspection
Portable Crusher #2 · 05038080.5 on-site hours reported
Verbal Hazard Complaint Inspections
Pine Mountain Stone · 15000561.5 on-site hours reported
Regular Safety and Health Inspection
C636-Sidney Crushing Facility · 17000023.3 on-site hours reported
Regular Safety and Health Inspection
BAILEY · 22007066.0 on-site hours reported
Regular Safety and Health Inspection
Brickeys Quarry · 230215718.0 on-site hours reported
Spot Inspection
ARP Portable Crusher #2 · 45007641.8 on-site hours reported
Access to stationary electrical equipment or switchgear.
Jenny Lind Quarry · 030042930 CFR 56.12019 · $151.00 proposed penalty
Air receiver tanks.
SUWANNEE AMERICAN CEMENT · 080131830 CFR 56.13011 · $151.00 proposed penalty
Housekeeping.
SUWANNEE AMERICAN CEMENT · 080131830 CFR 56.20003(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty
High-pressure hose connections.
SUWANNEE AMERICAN CEMENT · 080131830 CFR 56.13021 · $151.00 proposed penalty
Safe access.
SUWANNEE AMERICAN CEMENT · 080131830 CFR 56.11001 · $267.00 proposed penalty
Safe access.
SUWANNEE AMERICAN CEMENT · 080131830 CFR 56.11001 · $151.00 proposed penalty
Electrical conductors.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.12004 · $398.00 proposed penalty
Safe access.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.11001 · Significant and substantial (S&S) · $592.00 proposed penalty
Electric substations and liquid storage facilities.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.4130(b) · $151.00 proposed penalty
Securing gas cylinders.
Columbus Limestone · 330465730 CFR 56.16005 · $151.00 proposed penalty
Requirement for container labels.
Muskogee Dredge · 340039430 CFR 47.41(a) · $288.00 proposed penalty
Housekeeping.
Muskogee Dredge · 340039430 CFR 56.20003(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Brakes.
Okay Quarry · 340176130 CFR 56.14101(a)(2) · $151.00 proposed penalty
Roll-over protective structures (ROPS) and seat belts.
Okay Quarry · 340176130 CFR 56.14130(g) · Significant and substantial (S&S) · $151.00 proposed penalty
Regular Safety and Health Inspection
Preston Quarry · 030146224.3 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.