CRH PLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
ARP Portable Crusher #1 · 45032534.5 on-site hours reported
New miner training.
Gravette Quarry · 030201230 CFR 46.5(d) · Significant and substantial (S&S) · $288.00 proposed penalty
New miner training.
Gravette Quarry · 030201230 CFR 46.5(d) · Significant and substantial (S&S) · $168.00 proposed penalty
Inspection.
Gravette Quarry · 030201230 CFR 56.4201(a)(1) · $151.00 proposed penalty
Warning signs.
Gravette Quarry · 030201230 CFR 56.4101 · $151.00 proposed penalty
Requirement for container labels.
Gravette Quarry · 030201230 CFR 47.41(a) · $151.00 proposed penalty
Trimming stockpile and muckpile faces.
North Branford Quarry · 060001230 CFR 56.9314 · Significant and substantial (S&S) · $177.00 proposed penalty
Insulation and fittings for power wires and cables.
ARP Portable Crusher #1 · 450325330 CFR 56.12008 · $1,219.00 proposed penalty
Inspection and cover plates.
ARP Portable Crusher #1 · 450325330 CFR 56.12032 · $549.00 proposed penalty
Handling of materials
WEST NYACK QUARRY · 3000083Dys awy frm wrk & restrctd act
Accident narrative
EE was trying to climb into the truck and had EE's hands on the handrail. EE had to pull self up to the next step and started to feel sharp pain in EE's right hand going all the way to EE's arm. After miners latest doctor visit, Miner has been put on "Do not Work" status per miners Medical provider until next evaluation.
Regular Safety and Health Inspection
Burdick Portable #4 · 42024307.0 on-site hours reported
Regular Safety and Health Inspection
HUTCHINSON SAND PLANT · 14005014.0 on-site hours reported
Brakes.
SCOOTER MINE / Krystal · 220083230 CFR 56.14101(a)(2) · $151.00 proposed penalty
Moving machine parts.
SCOOTER MINE / Krystal · 220083230 CFR 56.14107(a) · $151.00 proposed penalty
Construction and maintenance of guards.
SCOOTER MINE / Krystal · 220083230 CFR 56.14112(b) · $151.00 proposed penalty
Parking procedures for unattended equipment.
SCOOTER MINE / Krystal · 220083230 CFR 56.14207 · $151.00 proposed penalty
Regular Safety and Health Inspection
SCOOTER MINE / Krystal · 22008326.0 on-site hours reported
Regular Safety and Health Inspection
Allied Corporation Inc · 33029138.0 on-site hours reported
Moving machine parts.
BAILEY · 220070630 CFR 56.14107(a) · $151.00 proposed penalty
Identification of power switches.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.12018 · $151.00 proposed penalty
Oxygen cylinder storage.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.4601 · $151.00 proposed penalty
Intoxicating beverages and narcotics.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.20001 · $151.00 proposed penalty
Housekeeping.
Allied Corporation Inc · 330291330 CFR 56.20003(a) · Significant and substantial (S&S) · $267.00 proposed penalty
Housekeeping.
Columbus Limestone · 330465730 CFR 56.20003(a) · $151.00 proposed penalty
Housekeeping.
Columbus Limestone · 330465730 CFR 56.20003(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.