Safety activity
Regular Safety and Health Inspection
RiverBend Materials Corvallis · 35027055.8 on-site hours reported
Regular Safety and Health Inspection
Portable 1 · 45035502.0 on-site hours reported
Examination of working places.
HUTCHINSON SAND PLANT · 140050130 CFR 56.18002(d) · $151.00 proposed penalty
Testing grounding systems.
HUTCHINSON SAND PLANT · 140050130 CFR 56.12028 · $151.00 proposed penalty
Controls and switches.
HUTCHINSON SAND PLANT · 140050130 CFR 56.12002 · $193.00 proposed penalty
Safe access.
HUTCHINSON SAND PLANT · 140050130 CFR 56.11001 · $642.00 proposed penalty
Combustible waste.
HUTCHINSON SAND PLANT · 140050130 CFR 56.4104(b) · $151.00 proposed penalty
Testing grounding systems.
Louisville Plant Quarry & Mill · 250000230 CFR 56.12028 · $2,503.00 proposed penalty
Testing grounding systems.
Louisville Plant Quarry & Mill · 250000230 CFR 56.12028 · $2,503.00 proposed penalty
Requirement for container labels.
Louisville Plant Quarry & Mill · 250000230 CFR 47.41(a) · $151.00 proposed penalty
Spillage and leakage.
Louisville Plant Quarry & Mill · 250000230 CFR 56.4102 · $151.00 proposed penalty
Barricades and warning signs.
Louisville Plant Quarry & Mill · 250000230 CFR 56.20011 · $398.00 proposed penalty
Requirements for written safety program.
Pit #97 Grand Island · 250123630 CFR 56.23003(b) · $151.00 proposed penalty
Ventilation and shielding for welding.
Mount Hope Quarry · 280002630 CFR 56.14213(a) · $151.00 proposed penalty
Construction and maintenance of guards.
EAST KINGSTON · 300345230 CFR 56.14112(a)(1) · $151.00 proposed penalty
Protection for openings around travelways.
EAST KINGSTON · 300345230 CFR 56.11012 · $151.00 proposed penalty
Construction and maintenance of guards.
EAST KINGSTON · 300345230 CFR 56.14112(b) · $151.00 proposed penalty
Safety defects; examination, correction and records.
EAST KINGSTON · 300345230 CFR 56.14100(c) · $151.00 proposed penalty
Grounding circuit enclosures.
EAST KINGSTON · 300345230 CFR 56.12025 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Fultonham Plant · 330004230 CFR 57.14100(c) · $151.00 proposed penalty
Construction and maintenance of guards.
MARBLE CLIFF QUARRY · 330009730 CFR 57.14112(a)(2) · $151.00 proposed penalty
Correction of hazardous conditions.
Thomasville Mine · 360343230 CFR 57.3200 · $151.00 proposed penalty
Spillage and leakage.
Thomasville Mine · 360343230 CFR 57.4102 · $151.00 proposed penalty
Examination of working places.
Hunter Cement Plant · 410282030 CFR 56.18002(b) · $151.00 proposed penalty
Moving machine parts.
Hunter Cement Plant · 410282030 CFR 56.14107(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.