Regular Safety and Health Inspection
Golden Gate Quarry · 08005267.0 on-site hours reported
Regular Safety and Health Inspection
Reedsville Pit · 330443323.0 on-site hours reported
Regular Safety and Health Inspection
Portland Plant · 330458120.0 on-site hours reported
Spot Inspection
Durkee Cement Plant · 35029701.5 on-site hours reported
Annual refresher training.
Golden Gate Quarry · 080052630 CFR 46.8(a)(2) · $168.00 proposed penalty
Safety defects; examination, correction and records.
Marble Falls Quarry · 410448930 CFR 56.14100(c) · Significant and substantial (S&S) · $697.00 proposed penalty
Electrical conductors.
Marble Falls Quarry · 410448930 CFR 56.12004 · $313.00 proposed penalty
Safety defects; examination, correction and records.
Marble Falls Quarry · 410448930 CFR 56.14100(c) · Significant and substantial (S&S) · $465.00 proposed penalty
Safety can use.
Marble Falls Quarry · 410448930 CFR 56.4402 · $151.00 proposed penalty
Regular Safety and Health Inspection
Patterson Road · 20029955.3 on-site hours reported
Regular Safety and Health Inspection
Cranston Quarry · 370000217.0 on-site hours reported
Electrical conductors.
Conco Willard Quarries · 230003530 CFR 56.12004 · $245.00 proposed penalty
Safe access.
Cranston Quarry · 370000230 CFR 56.11001 · $151.00 proposed penalty
New task training.
Marble Falls Quarry · 410448930 CFR 46.7(a) · $168.00 proposed penalty
Housekeeping.
Marble Falls Quarry · 410448930 CFR 56.20003(a) · $151.00 proposed penalty
Housekeeping.
Marble Falls Quarry · 410448930 CFR 56.20003(a) · $151.00 proposed penalty
Operating speeds and control of equipment.
MERCER STONE PLANT · 460279330 CFR 56.9101 · Significant and substantial (S&S) · $245.00 proposed penalty
Brakes.
MERCER STONE PLANT · 460279330 CFR 56.14101(a)(3) · Significant and substantial (S&S) · $165.00 proposed penalty
Handling of materials
Johnson County Aggregates · 1400068Days restricted activity only
Accident narrative
Left Hand slipped and hit the side at the screen box causing lacerations, with 3 stitches.
Powered haulage
MERCER STONE PLANT · 4602793Days away from work only
Accident narrative
Contract truck driver was loaded at the Agg Plant and while descending the hill to the scales, lost EE's brakes, jumped out of the dump truck receiving facial injuries and the truck continued down the road driverless through two berms before finally coming to rest a third berm.
Regular Safety and Health Inspection
Blackhawk Pit and Plant · 22002196.0 on-site hours reported
Regular Safety and Health Inspection
COXBURG SAND & GRAVEL · 22007405.0 on-site hours reported
Non-Fatal Accident Investigation
MERCER STONE PLANT · 460279325.8 on-site hours reported
Distribution boxes.
Tarburton Pit · 070009330 CFR 56.12006 · $151.00 proposed penalty
Taglines, hitches, and slings.
Conco Willard Quarries · 230003530 CFR 56.16007(b) · Significant and substantial (S&S) · $3,022.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.