Written safety program.
Ash Grove Cement Company · 410002630 CFR 56.23002(a) · $151.00 proposed penalty
Testing grounding systems.
Ash Grove Cement Company · 410002630 CFR 56.12028 · $1,431.00 proposed penalty
Electric substations and liquid storage facilities.
Cedar City Pit · 420227030 CFR 56.4130(b) · $151.00 proposed penalty
Moving machine parts.
Cedar City Pit · 420227030 CFR 56.14107(a) · Significant and substantial (S&S) · $465.00 proposed penalty
Securing gas cylinders.
Cedar City Pit · 420227030 CFR 56.16005 · $151.00 proposed penalty
Controls and switches.
Cedar City Pit · 420227030 CFR 56.12002 · $151.00 proposed penalty
Moving machine parts.
Castlewood · 440742430 CFR 56.14107(a) · Significant and substantial (S&S) · $549.00 proposed penalty
Housekeeping.
Castlewood · 440742430 CFR 56.20003(a) · $151.00 proposed penalty
Electrical conductors.
Castlewood · 440742430 CFR 56.12004 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Electrical conductors.
Castlewood · 440742430 CFR 56.12004 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Extinguisher recharging or replacement.
Castlewood · 440742430 CFR 56.4203 · $151.00 proposed penalty
Spot Inspection
Natural Bridge Stone · 150007515.5 on-site hours reported
Regular Safety and Health Inspection
Leroy Plant · 300003214.5 on-site hours reported
Regular Safety and Health Inspection
MANCHESTER PLANT · 30012549.5 on-site hours reported
Regular Safety and Health Inspection
Plant #17 Indian Road · 34018055.5 on-site hours reported
Regular Safety and Health Inspection
Ash Grove Cement Company · 410002677.5 on-site hours reported
Regular Safety and Health Inspection
Divot Quarry · 41048795.8 on-site hours reported
Regular Safety and Health Inspection
Castlewood · 440742445.0 on-site hours reported
Verbal Hazard Complaint Inspections
Castlewood · 44074242.0 on-site hours reported
Brakes.
MANCHESTER PLANT · 300125430 CFR 56.14101(a)(2) · $151.00 proposed penalty
Testing grounding systems.
Plant #17 Indian Road · 340180530 CFR 56.12028 · $151.00 proposed penalty
Heat sources.
Plant #17 Indian Road · 340180530 CFR 56.4500 · $151.00 proposed penalty
Inspection and cover plates.
Ash Grove Cement Company · 410002630 CFR 56.12032 · $642.00 proposed penalty
Distribution boxes.
Ash Grove Cement Company · 410002630 CFR 56.12006 · $151.00 proposed penalty
Machinery, equipment, and tools.
Ash Grove Cement Company · 410002630 CFR 56.14205 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.