CRH PLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Housekeeping.
Casey Stone Company · 150001230 CFR 56.20003(a) · $151.00 proposed penalty
Circuit overload protection.
Bourbon Limestone Company · 151841530 CFR 57.12001 · $151.00 proposed penalty
Safety defects; examination, correction and records.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.14100(c) · $177.00 proposed penalty
Safety defects; examination, correction and records.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.14100(c) · Significant and substantial (S&S) · $592.00 proposed penalty
Securing gas cylinders.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.16005 · $151.00 proposed penalty
Housekeeping.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.20003(a) · $755.00 proposed penalty
Moving machine parts.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.14107(a) · $1,431.00 proposed penalty
Unguarded conveyors with adjacent travelways.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.14109(b)(1) · $177.00 proposed penalty
Inspection and cover plates.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.12032 · $151.00 proposed penalty
Inspection and cover plates.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.12032 · $151.00 proposed penalty
Securing gas cylinders.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.16005 · $151.00 proposed penalty
Inspection and cover plates.
Waynesville Quarry · 310040030 CFR 56.12032 · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
Pittston Quarry · 360004830 CFR 56.12008 · Significant and substantial (S&S) · $313.00 proposed penalty
Warning signs.
Pittston Quarry · 360004830 CFR 56.4101 · $151.00 proposed penalty
Regular Safety and Health Inspection
Howard Plant · 30027543.0 on-site hours reported
Regular Safety and Health Inspection
Waynesville Quarry · 310040021.5 on-site hours reported
Regular Safety and Health Inspection
Pittston Quarry · 360004822.8 on-site hours reported
Regular Safety and Health Inspection
Sorensen Pit · 420226714.5 on-site hours reported
Explosive material storage practices.
Cape Sandy #1 · 120008430 CFR 56.6102(a)(1) · $151.00 proposed penalty
Parking procedures for unattended equipment.
Cape Sandy #1 · 120008430 CFR 56.14207 · $151.00 proposed penalty
Dust control.
Cape Sandy #1 · 120008430 CFR 56.9315 · $151.00 proposed penalty
Berms or guardrails.
Pittston Quarry · 360004830 CFR 56.9300(b) · $209.00 proposed penalty
Construction and maintenance of guards.
Sorensen Pit · 420226730 CFR 56.14112(b) · $151.00 proposed penalty
Electrical conductors.
Sorensen Pit · 420226730 CFR 56.12004 · $151.00 proposed penalty
Electrical conductors.
Evans Crusher #1 · 480114130 CFR 56.12004 · $209.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.