PIKE INDUSTRIES WASH SCREW-DANBY · 430071530 CFR 56.14100(c) · Significant and substantial (S&S) · $366.00 proposed penalty
Brakes.
PIKE INDUSTRIES WASH SCREW-DANBY · 430071530 CFR 56.14101(a)(3) · $151.00 proposed penalty
Slip or fall of person
New Amsterdam Quarry · 1202236Days restricted activity only
Accident narrative
EE was exiting EE's haul truck at the end of EE's shift. When EE stepped down to the ground EE stepped on EE's ankle wrong and fell down. When falling EE's right elbow hit the ground. EE was taken to OMP on 8/17/26 for further evaluation and placed on restricted duty.
Slip or fall of person
Mount Hope Quarry · 2800026Dys awy frm wrk & restrctd act
Accident narrative
Employee walking out of change room fell on EE's lunchbox fell on EE's side hurting EE's left knee and left ribs.
Regular Safety and Health Inspection
Golden Gate Quarry · 08005269.5 on-site hours reported
Safety can use.
Golden Gate Quarry · 080052630 CFR 56.4402 · $151.00 proposed penalty
Electrical conductors.
CHANUTE QUARRY · 140003430 CFR 56.12004 · $398.00 proposed penalty
Electrical conductors.
CHANUTE QUARRY · 140003430 CFR 56.12004 · $398.00 proposed penalty
High-pressure hose connections.
CHANUTE QUARRY · 140003430 CFR 56.13021 · $398.00 proposed penalty
Electrical conductors.
CHANUTE QUARRY · 140003430 CFR 56.12004 · $398.00 proposed penalty
Safety defects; examination, correction and records.
CHANUTE QUARRY · 140003430 CFR 56.14100(b) · $336.00 proposed penalty
Inspection.
CHANUTE QUARRY · 140003430 CFR 56.4201(a)(2) · $177.00 proposed penalty
General requirements.
CHANUTE QUARRY · 140003430 CFR 56.4200(b)(2) · $398.00 proposed penalty
Access to stationary electrical equipment or switchgear.
CHANUTE QUARRY · 140003430 CFR 56.12019 · $398.00 proposed penalty
Storage of hazardous materials.
CHANUTE QUARRY · 140003430 CFR 56.16003 · Significant and substantial (S&S) · $2,936.00 proposed penalty
Safety defects; examination, correction and records.
CHANUTE QUARRY · 140003430 CFR 56.14100(b) · $755.00 proposed penalty
General requirements.
CHANUTE QUARRY · 140003430 CFR 56.4200(b)(2) · $177.00 proposed penalty
Inspection and cover plates.
CHANUTE QUARRY · 140003430 CFR 56.12032 · $1,320.00 proposed penalty
Moving machine parts.
CHANUTE QUARRY · 140003430 CFR 56.14107(a) · $592.00 proposed penalty
Electrical conductors.
CHANUTE QUARRY · 140003430 CFR 56.12004 · $398.00 proposed penalty
Inspection.
CHANUTE QUARRY · 140003430 CFR 56.4201(a)(2) · $398.00 proposed penalty
Portable rigid ladders.
CHANUTE QUARRY · 140003430 CFR 56.11004 · $177.00 proposed penalty
Identification of power switches.
CHANUTE QUARRY · 140003430 CFR 56.12018 · $177.00 proposed penalty
Spot Inspection
Casey Stone Company · 15000129.0 on-site hours reported
Regular Safety and Health Inspection
Stoneco Finlay Plant · 20035873.3 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.