Regular Safety and Health Inspection
Benton Plant · 22008266.5 on-site hours reported
Regular Safety and Health Inspection
Wedowee Quarry · 01032649.0 on-site hours reported
Regular Safety and Health Inspection
Blackhawk Pit and Plant · 22002197.0 on-site hours reported
Regular Safety and Health Inspection
Dunn Pit · 22008317.8 on-site hours reported
Regular Safety and Health Inspection
Pioneer Crusher · 22008633.0 on-site hours reported
Compliance Follow-up Inspection
CLINTON POINT QUARRY & MILL · 30000824.8 on-site hours reported
Inspection and cover plates.
Wedowee Quarry · 010326430 CFR 56.12032 · Significant and substantial (S&S) · $1,037.00 proposed penalty
Housekeeping.
Wedowee Quarry · 010326430 CFR 56.20003(a) · $151.00 proposed penalty
Horns and backup alarms.
Wedowee Quarry · 010326430 CFR 56.14132(a) · $151.00 proposed penalty
Independent contractor register.
Dunn Pit · 220083130 CFR 45.4(b) · $151.00 proposed penalty
Berms or guardrails.
MARBLE CLIFF QUARRY · 330009730 CFR 57.9300(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Handling of materials
NEW HAVEN CRUSHED STONE C600 · 4300185No dys awy frm wrk,no rstr act
Accident narrative
Employee was cleaning under the conveyor, feet slipped on the rocks and they did a split. Felt pain in groin and rectal area. They thought the pain was a hemorrhoid so they did not report it as work related. They went to the ER on 7/31 and it is not a hemorrhoid, employee needs to see a surgeon.
Spot Inspection
Sumterville Cement Plant · 08013700.0 on-site hours reported
Spot Inspection
Riverside Stone · 151854912.0 on-site hours reported
Regular Safety and Health Inspection
Three Sisters · 22008485.5 on-site hours reported
Verbal Hazard Complaint Inspections
Waynesville Quarry · 31004004.0 on-site hours reported
Regular Safety and Health Inspection
Bourbon Limestone Company · 151841530.0 on-site hours reported
Regular Safety and Health Inspection
Lebanon Crushed Stone C623 · 27000039.3 on-site hours reported
Verbal Hazard Complaint Inspections
Ash Grove Cement Company · 41000263.0 on-site hours reported
Safety defects; examination, correction and records.
Lebanon Crushed Stone C623 · 270000330 CFR 56.14100(b) · $151.00 proposed penalty
Handling of materials
Foreman Quarry & Plant · 0300256Days away from work only
Accident narrative
While applying downward force on a valve an employee experienced pain in their right shoulder.
Impoundment Spot Inspection
NICHOLS PIT · 22007774.0 on-site hours reported
Verbal Hazard Complaint Inspections
New Britain Quarry · 06000221.0 on-site hours reported
Safety defects; examination, correction and records.
Natural Bridge Stone · 150007530 CFR 56.14100(b) · $151.00 proposed penalty
Construction and maintenance of guards.
MARBLE CLIFF QUARRY · 330009730 CFR 57.14112(b) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.