Securing gas cylinders.
CHANUTE QUARRY · 140003430 CFR 56.16005 · $504.00 proposed penalty
Controls and switches.
CHANUTE QUARRY · 140003430 CFR 56.12002 · $3,448.00 proposed penalty
Securing gas cylinders.
CHANUTE QUARRY · 140003430 CFR 56.16005 · $504.00 proposed penalty
Housekeeping.
CHANUTE QUARRY · 140003430 CFR 56.20003(a) · $1,037.00 proposed penalty
Housekeeping.
CHANUTE QUARRY · 140003430 CFR 56.20003(a) · $1,550.00 proposed penalty
Construction and maintenance of guards.
CHANUTE QUARRY · 140003430 CFR 56.14112(b) · $755.00 proposed penalty
Housekeeping.
CHANUTE QUARRY · 140003430 CFR 56.20003(a) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Spillage and leakage.
CHANUTE QUARRY · 140003430 CFR 56.4102 · Significant and substantial (S&S) · $2,503.00 proposed penalty
Construction and maintenance of guards.
CHANUTE QUARRY · 140003430 CFR 56.14112(b) · $336.00 proposed penalty
Inspection.
CHANUTE QUARRY · 140003430 CFR 56.4201(a)(1) · $1,126.00 proposed penalty
Electrical conductors.
CHANUTE QUARRY · 140003430 CFR 56.12004 · $226.00 proposed penalty
Construction and maintenance of guards.
CHANUTE QUARRY · 140003430 CFR 56.14112(b) · $755.00 proposed penalty
Housekeeping.
CHANUTE QUARRY · 140003430 CFR 56.20003(a)
Housekeeping.
CHANUTE QUARRY · 140003430 CFR 56.20003(a) · Significant and substantial (S&S) · $5,716.00 proposed penalty
Safe access.
CHANUTE QUARRY · 140003430 CFR 56.11001 · Significant and substantial (S&S) · $2,503.00 proposed penalty
Locking transformer enclosures.
CHANUTE QUARRY · 140003430 CFR 56.12068 · $1,679.00 proposed penalty
Controls and switches.
CHANUTE QUARRY · 140003430 CFR 56.12002 · $3,448.00 proposed penalty
Testing grounding systems.
CHANUTE QUARRY · 140003430 CFR 56.12028 · $697.00 proposed penalty
Securing gas cylinders.
CHANUTE QUARRY · 140003430 CFR 56.16005 · $755.00 proposed penalty
Inspection and cover plates.
CHANUTE QUARRY · 140003430 CFR 56.12032 · $1,219.00 proposed penalty
Housekeeping.
CHANUTE QUARRY · 140003430 CFR 56.20003(c) · $504.00 proposed penalty
General instructions for completing MSHA Form 7000-1.
Brickeys Quarry · 230215730 CFR 50.20-1 · $151.00 proposed penalty
Moving machine parts.
SOUTH BETHLEHEM · 300001330 CFR 56.14107(a) · $151.00 proposed penalty
Moving machine parts.
SOUTH BETHLEHEM · 300001330 CFR 56.14107(a) · $151.00 proposed penalty
Unguarded conveyors with adjacent travelways.
SOUTH BETHLEHEM · 300001330 CFR 56.14109(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.