CRH PLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Housekeeping.
Franklinton Crusher Plant · 160117730 CFR 56.20003(a) · Significant and substantial (S&S) · $245.00 proposed penalty
Safe access.
Fultonham Plant · 330004230 CFR 57.11001 · Significant and substantial (S&S) · $549.00 proposed penalty
Construction and maintenance of guards.
Ash Grove Tooele Plant · 420272530 CFR 56.14112(b) · $226.00 proposed penalty
Safety defects; examination, correction and records.
Ash Grove Tooele Plant · 420272530 CFR 56.14100(b) · $226.00 proposed penalty
Handtools (nonpowered)
TV Plant #001295 · 1001818Days restricted activity only
Accident narrative
Employee was changing the liner on the HP300 cone on the newly acquired crushing equipment. During this activity EE was swinging a 12lb sledgehammer to loosen or tighten the mantle to the head. Employee had an MRI and on 1/29/25. EE was given the results that EE has a torn rotator cuff.
Regular Safety and Health Inspection
Tremont Pit · 22007845.0 on-site hours reported
Spot Inspection
Cape Sandy #1 · 120008411.5 on-site hours reported
Regular Safety and Health Inspection
Candor Sand Pit · 31013544.0 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
Durkee Cement Plant · 35029703.8 on-site hours reported
Regular Safety and Health Inspection
Goins Hollow Quarry · 40033439.8 on-site hours reported
Safety defects; examination, correction and records.
Pine Mountain Stone · 150005630 CFR 56.14100(b) · Significant and substantial (S&S) · $336.00 proposed penalty
Locking transformer enclosures.
PRESCOTT QUARRY · 360003930 CFR 56.12068 · $226.00 proposed penalty
Brakes.
Goins Hollow Quarry · 400334330 CFR 56.14101(a)(3) · $151.00 proposed penalty
Safety can use.
Goins Hollow Quarry · 400334330 CFR 56.4402 · $151.00 proposed penalty
General instructions for completing MSHA Form 7000-2.
Ash Grove Cement Company · 410002630 CFR 50.30-1(g)(3) · $151.00 proposed penalty
General instructions for completing MSHA Form 7000-2.
Ash Grove Cement Company · 410002630 CFR 50.30-1(g)(3) · $151.00 proposed penalty
General instructions for completing MSHA Form 7000-2.
Ash Grove Cement Company · 410002630 CFR 50.30-1(g)(3) · $151.00 proposed penalty
General instructions for completing MSHA Form 7000-2.
Ash Grove Cement Company · 410002630 CFR 50.30-1(g)(3) · $151.00 proposed penalty
Housekeeping.
Ash Grove Cement Company · 410002630 CFR 56.20003(a) · $193.00 proposed penalty
Inspection.
Ash Grove Cement Company · 410002630 CFR 56.4201(a)(1) · $193.00 proposed penalty
Brakes.
Ash Grove Cement Company · 410002630 CFR 56.14101(a)(3) · Significant and substantial (S&S) · $959.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.