Durkee Cement Plant · 350297030 CFR 56.20003(a) · $151.00 proposed penalty
Explosive material storage practices.
Durkee Cement Plant · 350297030 CFR 56.6102(a)(3) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Construction and maintenance of guards.
Durkee Cement Plant · 350297030 CFR 56.14112(a)(1) · $226.00 proposed penalty
Construction and maintenance of guards.
Durkee Cement Plant · 350297030 CFR 56.14112(a)(1) · $226.00 proposed penalty
Construction and maintenance of guards.
Durkee Cement Plant · 350297030 CFR 56.14112(a)(1) · $226.00 proposed penalty
Housekeeping.
Durkee Cement Plant · 350297030 CFR 56.20003(a) · $151.00 proposed penalty
First aid materials.
Thomasville Mine · 360343230 CFR 57.15001 · $151.00 proposed penalty
Safe access.
Thomasville Mine · 360343230 CFR 57.11001 · $151.00 proposed penalty
Parking procedures for unattended equipment.
Thomasville Mine · 360343230 CFR 57.14207 · $504.00 proposed penalty
Requirement for container labels.
Thomasville Mine · 360343230 CFR 47.41(a) · $151.00 proposed penalty
Access to stationary electrical equipment or switchgear.
Thomasville Mine · 360343230 CFR 57.12019 · $151.00 proposed penalty
Action level.
ARP Portable Crusher #1 · 450325330 CFR 62.120 · $151.00 proposed penalty
Inspection of compressed-air receivers and other unfired pressure vessels.
ARP Portable Crusher #1 · 450325330 CFR 56.13015(a) · $151.00 proposed penalty
Housekeeping.
ARP Portable Crusher #1 · 450325330 CFR 56.20003(a) · $151.00 proposed penalty
Moving machine parts.
ARP Portable Crusher #1 · 450325330 CFR 56.14107(a) · $151.00 proposed penalty
Powered haulage
Thomasville Mine · 3603432Dys awy frm wrk & restrctd act
Accident narrative
Employee was working underneath a silo load out, while a tanker truck was parked. The tanker truck pulled forward without the employee knowing and ran over their foot causing a break in their pinky toe metatarsal.
Handling of materials
Western Rock Fast Pack · 4202099No dys awy frm wrk,no rstr act
Accident narrative
While removing an old piece of metal off the top deck of a discharge chute on a screening plant, the technician picked up the metal and it cut through the technician's glove and into finger causing a laceration.
Slip or fall of person
Bluefield Plant · 4400096Days restricted activity only
Accident narrative
Employee was conducting pre shift inspection on sand plant, slipped on ice, fell and broke their left wrist.
Compliance Follow-up Inspection
Treasure Valley Portable #2 · 10017420.3 on-site hours reported
Regular Safety and Health Inspection
MARBLE CLIFF QUARRY · 330009767.0 on-site hours reported
Regular Safety and Health Inspection
Durkee Cement Plant · 350297051.0 on-site hours reported
Regular Safety and Health Inspection
Thomasville Mine · 360343248.5 on-site hours reported
Compliance Follow-up Inspection
Ash Grove Cement Company · 41000260.0 on-site hours reported
Regular Safety and Health Inspection
ARP Portable Crusher #1 · 450325314.5 on-site hours reported
HazCom program contents.
Fultonham Plant · 330004230 CFR 47.32(b) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.