CRH PLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Portland Plant · 330458122.0 on-site hours reported
Regular Safety and Health Inspection
East Quarry · 340005017.3 on-site hours reported
Regular Safety and Health Inspection
Vinita Quarry · 34008930.0 on-site hours reported
Regular Safety and Health Inspection
Rosevine Quarry · 41046764.5 on-site hours reported
General requirements.
Ralston Quarry · 050300730 CFR 56.4200(a)(1) · $151.00 proposed penalty
Inspection.
Ralston Quarry · 050300730 CFR 56.4201(a)(2) · $151.00 proposed penalty
Safe access.
Ralston Quarry · 050300730 CFR 56.11001 · Significant and substantial (S&S) · $336.00 proposed penalty
Requirements for written safety program.
CHANUTE QUARRY · 140003430 CFR 56.23003(c) · $151.00 proposed penalty
Training plans.
CHANUTE QUARRY · 140003430 CFR 46.3(a) · $151.00 proposed penalty
Danger signs.
CHANUTE QUARRY · 140003430 CFR 56.12021 · $245.00 proposed penalty
Barricades and warning signs.
Conco Quarries-Marshfield · 230192830 CFR 56.20011 · $177.00 proposed penalty
Berms or guardrails.
Cherokee Co Quarry · 310213830 CFR 56.9300(b) · Significant and substantial (S&S) · $313.00 proposed penalty
Unguarded conveyors with adjacent travelways.
Reedsville Pit · 330443330 CFR 56.14109(a) · $151.00 proposed penalty
Safe access.
Columbus Limestone · 330465730 CFR 56.11001 · Significant and substantial (S&S) · $336.00 proposed penalty
Construction and maintenance of guards.
Hunter Cement Plant · 410282030 CFR 56.14112(b) · $504.00 proposed penalty
Moving machine parts.
Hunter Cement Plant · 410282030 CFR 56.14107(a) · $504.00 proposed penalty
Inspection.
Hunter Cement Plant · 410282030 CFR 56.4201(a)(3) · $336.00 proposed penalty
Identification of power switches.
Hunter Cement Plant · 410282030 CFR 56.12018 · $336.00 proposed penalty
Horns and backup alarms.
Rosevine Quarry · 410467630 CFR 56.14132(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Hunter Cement Plant · 410282029.5 on-site hours reported
Regular Safety and Health Inspection
Evans Crusher #1 · 48011418.3 on-site hours reported
First-aid materials.
CHANUTE QUARRY · 140003430 CFR 56.15001 · Significant and substantial (S&S) · $549.00 proposed penalty
Heat sources.
CHANUTE QUARRY · 140003430 CFR 56.4500 · $165.00 proposed penalty
Electrical conductors.
CHANUTE QUARRY · 140003430 CFR 56.12004 · $245.00 proposed penalty
Protection of persons at switchgear.
CHANUTE QUARRY · 140003430 CFR 56.12020 · Significant and substantial (S&S) · $2,712.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.