CRH PLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Dust control.
Columbus Limestone · 330465730 CFR 56.9315 · Significant and substantial (S&S) · $1,320.00 proposed penalty
Requirement for container labels.
East Quarry · 340005030 CFR 47.41(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
East Quarry · 340005030 CFR 56.14100 · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
East Quarry · 340005030 CFR 50.30(a) · $209.00 proposed penalty
Horns and backup alarms.
East Quarry · 340005030 CFR 56.14132(a) · $336.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
East Quarry · 340005030 CFR 50.30(a) · $151.00 proposed penalty
Parking procedures for unattended equipment.
East Quarry · 340005030 CFR 56.14207 · $151.00 proposed penalty
Horns and backup alarms.
East Quarry · 340005030 CFR 56.14132(b)(1) · $151.00 proposed penalty
Parking procedures for unattended equipment.
East Quarry · 340005030 CFR 56.14207 · $151.00 proposed penalty
Electrical conductors.
Vinita Quarry · 340089330 CFR 56.12004 · $151.00 proposed penalty
Construction and maintenance of ladders.
Vinita Quarry · 340089330 CFR 56.11003 · $151.00 proposed penalty
Construction and maintenance of guards.
Vinita Quarry · 340089330 CFR 56.14112(a)(1) · $151.00 proposed penalty
Brakes.
Vinita Quarry · 340089330 CFR 56.14101(a)(2) · $209.00 proposed penalty
Safety defects; examination, correction and records.
Vinita Quarry · 340089330 CFR 56.14100(b) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
Hunter Cement Plant · 410282030 CFR 56.12008 · $336.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Hunter Cement Plant · 410282030 CFR 50.30(a) · $151.00 proposed penalty
Construction and maintenance of guards.
Hunter Cement Plant · 410282030 CFR 56.14112(a)(1) · $504.00 proposed penalty
Inspection.
Hunter Cement Plant · 410282030 CFR 56.4201(a)(3) · $336.00 proposed penalty
Handling of materials
Madbury Pit C629 · 2700128Days restricted activity only
Accident narrative
Employee was changing the screens when EE felt pain in EE's back
Slip or fall of person
Gore Quarry · 3401713No dys awy frm wrk,no rstr act
Accident narrative
The employee was climbing down the ladder of a haul truck, missed the last few steps and fell to the ground.
Regular Safety and Health Inspection
Ralston Quarry · 050300720.8 on-site hours reported
Regular Safety and Health Inspection
Portable Crusher #1 · 05048544.8 on-site hours reported
Regular Safety and Health Inspection
Conco Quarries-Marshfield · 23019286.0 on-site hours reported
Regular Safety and Health Inspection
Belmont Sand & Gravel (C627) · 27003133.8 on-site hours reported
Regular Safety and Health Inspection
Cherokee Co Quarry · 310213818.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.