CRH PLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Sullivan Road Facility · 45027094.3 on-site hours reported
Flying or falling materials.
Bourbon Limestone Company · 151841530 CFR 57.14110 · $226.00 proposed penalty
Handrails and toeboards.
Bourbon Limestone Company · 151841530 CFR 57.11002 · $151.00 proposed penalty
Construction and maintenance of guards.
Stoneco, Inc. · 330018130 CFR 56.14112(b) · $151.00 proposed penalty
Brakes.
Mt Holly Quarry · 360321530 CFR 56.14101(a)(2) · $209.00 proposed penalty
Insulation and fittings for power wires and cables.
Seattle Plant · 450035930 CFR 56.12008 · $245.00 proposed penalty
Housekeeping.
Seattle Plant · 450035930 CFR 56.20003(a) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Regular Safety and Health Inspection
New Amsterdam Quarry · 120223615.5 on-site hours reported
Electrical conductors.
MARBLE CLIFF QUARRY · 330009730 CFR 57.12004 · $151.00 proposed penalty
Protection for openings around travelways.
Auglaize Plant · 330010330 CFR 56.11012 · $151.00 proposed penalty
Machinery
Cape Sandy #1 · 1200084No dys awy frm wrk,no rstr act
Accident narrative
Employee was drilling a hole through a stainless steel box. They reversed the drill and that pushed the drill out, pushing their thumb against the stainless steel edge. Employee was cut on the top of their thumb between the first and second knuckle.
Regular Safety and Health Inspection
Midland Quarry · 03019745.0 on-site hours reported
Regular Safety and Health Inspection
IMC Pocatello Portable Screening Plant · 10023228.0 on-site hours reported
Regular Safety and Health Inspection
Auglaize Plant · 330010324.0 on-site hours reported
Regular Safety and Health Inspection
Penn Township Quarry · 360927213.5 on-site hours reported
Regular Safety and Health Inspection
Keigley Quarry · 420002115.5 on-site hours reported
Insulation and fittings for power wires and cables.
IMC Pocatello Portable Screening Plant · 100232230 CFR 56.12008 · $165.00 proposed penalty
Moving machine parts.
HSS Q Portable Plant 1 · 140164630 CFR 56.14107(a) · $151.00 proposed penalty
Inspection.
Celina Quarry · 330008730 CFR 56.4201(a)(2) · $151.00 proposed penalty
Access to stationary electrical equipment or switchgear.
Celina Quarry · 330008730 CFR 56.12019 · $151.00 proposed penalty
Inspection and cover plates.
Stoneco, Inc. · 330018130 CFR 56.12032 · $151.00 proposed penalty
Identification of power switches.
Keigley Quarry · 420002130 CFR 56.12018 · $226.00 proposed penalty
Regular Safety and Health Inspection
Bourbon Limestone Company · 151841514.0 on-site hours reported
Regular Safety and Health Inspection
MARBLE CLIFF QUARRY · 330009728.8 on-site hours reported
Regular Safety and Health Inspection
Interstate Concrete and Asphalt-Hawkins · 45006044.3 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.