CRH PLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Guarding electrical connections and resistor grids.
Ash Grove Cement Company · 410002630 CFR 56.12023 · $642.00 proposed penalty
Testing grounding systems.
Ash Grove Cement Company · 410002630 CFR 56.12028 · $642.00 proposed penalty
Securing movable parts.
Ash Grove Cement Company · 410002630 CFR 56.14206(b) · $151.00 proposed penalty
Brakes.
Ash Grove Cement Company · 410002630 CFR 56.14101(a)(2) · $151.00 proposed penalty
Construction and maintenance of guards.
Ash Grove Cement Company · 410002630 CFR 56.14112(a)(1) · $959.00 proposed penalty
Inspection.
Ash Grove Cement Company · 410002630 CFR 56.4201(a)(2) · $151.00 proposed penalty
New task training.
Ash Grove Cement Company · 410002630 CFR 46.7(a) · $168.00 proposed penalty
Correction of dangerous conditions.
Ash Grove Cement Company · 410002630 CFR 56.12030 · $642.00 proposed penalty
Testing grounding systems.
Ash Grove Cement Company · 410002630 CFR 56.12028 · $642.00 proposed penalty
Testing grounding systems.
Ash Grove Cement Company · 410002630 CFR 56.12028 · $642.00 proposed penalty
General instructions for completing MSHA Form 7000-2.
Ash Grove Cement Company · 410002630 CFR 50.30-1(g)(2) · $151.00 proposed penalty
General instructions for completing MSHA Form 7000-1.
Ash Grove Cement Company · 410002630 CFR 50.20-1 · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Ash Grove Cement Company · 410002630 CFR 50.30(a) · $151.00 proposed penalty
Protection of gas cylinder valves.
ARP Portable Crusher #2 · 450076430 CFR 56.16006 · Significant and substantial (S&S) · $3,448.00 proposed penalty
Handtools (nonpowered)
MONTANA CITY PLANT · 2400015Days restricted activity only
Accident narrative
Employee was retrieving garbage bags from a dumpster that had mistakenly been thrown in the wrong roll off. EE was using a grabber tool to retrieve the bags, as EE was pulling a bag towards the front of the dumpster, EE felt a pop and discomfort in EE's neck. Taken to the clinic on 7/7/25 and diagnosed with a strained muscle in EE's neck and placed on light duty.
Regular Safety and Health Inspection
Darling Mine · 02001818.0 on-site hours reported
Regular Safety and Health Inspection
HUTCHINSON SAND PLANT · 14005018.8 on-site hours reported
Compliance Follow-up Inspection
Louisville Plant Quarry & Mill · 25000023.0 on-site hours reported
Regular Safety and Health Inspection
Pittston Quarry · 360004811.0 on-site hours reported
Regular Safety and Health Inspection
Ash Grove Cement Company · 410002662.0 on-site hours reported
Regular Safety and Health Inspection
Hot Springs · 420232014.0 on-site hours reported
Regular Safety and Health Inspection
ARP Portable Crusher #2 · 45007646.8 on-site hours reported
Horns and backup alarms.
HAVERSTRAW QUARRY & MILL · 300007530 CFR 56.14132(a) · $151.00 proposed penalty
Testing grounding systems.
HAVERSTRAW QUARRY & MILL · 300007530 CFR 56.12028 · $151.00 proposed penalty
Training plans.
Silver Springs Quarry · 360021230 CFR 46.3(b)(4) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.