← CRH PLC

CRH PLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Parking procedures for unattended equipment.

    violationRecord 9766723
    Louisville Plant Quarry & Mill · 2500002

    30 CFR 56.14207 · $151.00 proposed penalty

  2. Parking procedures for unattended equipment.

    violationRecord 9766722
    Louisville Plant Quarry & Mill · 2500002

    30 CFR 56.14207 · $151.00 proposed penalty

  3. Housekeeping.

    violationRecord 9766721
    Louisville Plant Quarry & Mill · 2500002

    30 CFR 56.20003(b) · $432.00 proposed penalty

  4. Safety defects; examination, correction and records.

    violationRecord 9766161
    Louisville Plant Quarry & Mill · 2500002

    30 CFR 56.14100(b) · $151.00 proposed penalty

  5. Handrails and toeboards.

    violationRecord 9766160
    Louisville Plant Quarry & Mill · 2500002

    30 CFR 56.11002 · $151.00 proposed penalty

  6. Moving machine parts.

    violationRecord 9766159
    Louisville Plant Quarry & Mill · 2500002

    30 CFR 56.14107(a) · $151.00 proposed penalty

  7. Housekeeping.

    violationRecord 9766158
    Louisville Plant Quarry & Mill · 2500002

    30 CFR 56.20003(b) · $165.00 proposed penalty

  8. Exposure monitoring.

    violationRecord 9766157
    Louisville Plant Quarry & Mill · 2500002

    30 CFR 56.5002 · Significant and substantial (S&S) · $3,448.00 proposed penalty

  9. Correction of hazardous conditions.

    violationRecord 9809550
    MARBLE CLIFF QUARRY · 3300097

    30 CFR 57.3200 · Significant and substantial (S&S) · $313.00 proposed penalty

  10. Check-in, check-out system.

    violationRecord 9809549
    MARBLE CLIFF QUARRY · 3300097

    30 CFR 57.11058 · $151.00 proposed penalty

  11. Check-in, check-out system.

    violationRecord 9809548
    MARBLE CLIFF QUARRY · 3300097

    30 CFR 57.11058 · $151.00 proposed penalty

  12. Examination of working places.

    violationRecord 9759560
    Stantonville Sand and Gravel · 4003630

    30 CFR 56.18002(b) · $151.00 proposed penalty

  13. Moving machine parts.

    violationRecord 9759559
    Stantonville Sand and Gravel · 4003630

    30 CFR 56.14107(a) · $151.00 proposed penalty

  14. Moving machine parts.

    violationRecord 9759558
    Stantonville Sand and Gravel · 4003630

    30 CFR 56.14107(a) · $151.00 proposed penalty

  15. Temporary, portable containers.

    violationRecord 9759557
    Stantonville Sand and Gravel · 4003630

    30 CFR 47.44(b) · $151.00 proposed penalty

  16. Handling of materials

    accidentRecord 220251600004
    Mount Hope Quarry · 2800026

    Days away from work only

    Accident narrative

    Changing starter rod; 6" drill hammer fell over striking miner in right foot above toe protection

  17. Regular Safety and Health Inspection

    inspectionRecord F019E90
    Mulberry Quarry · 0901152

    18.5 on-site hours reported

  18. Regular Safety and Health Inspection

    inspectionRecord F0146E1
    Portable Crusher 134 · 1001892

    16.0 on-site hours reported

  19. Spot Inspection

    inspectionRecord F00783E
    Somerset Stone Company · 1500094

    9.0 on-site hours reported

  20. Spot Inspection

    inspectionRecord F00E0C9
    Fultonham Plant · 3300042

    16.0 on-site hours reported

  21. Regular Safety and Health Inspection

    inspectionRecord F020002
    Stantonville Sand and Gravel · 4003630

    5.8 on-site hours reported

  22. Securing gas cylinders.

    violationRecord 9994569
    Foreman Quarry & Plant · 0300256

    30 CFR 56.16005 · $697.00 proposed penalty

  23. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 9994568
    Foreman Quarry & Plant · 0300256

    30 CFR 50.30(a) · $151.00 proposed penalty

  24. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 9994567
    Foreman Quarry & Plant · 0300256

    30 CFR 50.30(a) · $151.00 proposed penalty

  25. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 9994566
    Foreman Quarry & Plant · 0300256

    30 CFR 50.30(a) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.