← CRH PLC

CRH PLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspection

    inspectionRecord F00E0CA
    MARBLE CLIFF QUARRY · 3300097

    11.5 on-site hours reported

  2. Regular Safety and Health Inspection

    inspectionRecord F008C6E
    DICKENSONVILLE PLANT · 4407168

    40.8 on-site hours reported

  3. Procedures during repairs or maintenance.

    violationRecord 9994572
    Foreman Quarry & Plant · 0300256

    30 CFR 56.14105 · Significant and substantial (S&S) · $3,448.00 proposed penalty

  4. Construction and maintenance of guards.

    violationRecord 9994571
    Foreman Quarry & Plant · 0300256

    30 CFR 56.14112(b) · $1,037.00 proposed penalty

  5. Construction and maintenance of guards.

    violationRecord 9994570
    Foreman Quarry & Plant · 0300256

    30 CFR 56.14112(b) · $1,037.00 proposed penalty

  6. Construction and maintenance of guards.

    violationRecord 5001362
    Foreman Quarry & Plant · 0300256

    30 CFR 56.14112(a)(1) · $697.00 proposed penalty

  7. Scaffolds and working platforms.

    violationRecord 5001361
    Foreman Quarry & Plant · 0300256

    30 CFR 56.11027 · $151.00 proposed penalty

  8. Illumination of surface working areas.

    violationRecord 5001360
    Foreman Quarry & Plant · 0300256

    30 CFR 56.17001 · $697.00 proposed penalty

  9. Warning signs.

    violationRecord 5052926
    Portable Crusher 134 · 1001892

    30 CFR 56.4101 · $151.00 proposed penalty

  10. Inspection and cover plates.

    violationRecord 5052925
    Portable Crusher 134 · 1001892

    30 CFR 56.12032 · $151.00 proposed penalty

  11. Construction and maintenance of guards.

    violationRecord 5052924
    Portable Crusher 134 · 1001892

    30 CFR 56.14112(a)(1) · $193.00 proposed penalty

  12. Moving machine parts.

    violationRecord 5052923
    Portable Crusher 134 · 1001892

    30 CFR 56.14107(a) · $193.00 proposed penalty

  13. Requirement for container labels.

    violationRecord 5052922
    Portable Crusher 134 · 1001892

    30 CFR 47.41(a) · $151.00 proposed penalty

  14. Safety defects; examination, correction and records.

    violationRecord 9778170
    Natural Bridge Stone · 1500075

    30 CFR 57.14100(b) · $151.00 proposed penalty

  15. Safe access.

    violationRecord 9809679
    Wells Quarry C624 · 1700218

    30 CFR 56.11001 · $151.00 proposed penalty

  16. Electrical conductors.

    violationRecord 5062209
    Blackhawk Pit and Plant · 2200219

    30 CFR 56.12004 · $151.00 proposed penalty

  17. Electrical conductors.

    violationRecord 5062208
    Blackhawk Pit and Plant · 2200219

    30 CFR 56.12004 · $151.00 proposed penalty

  18. Safety defects; examination, correction and records.

    violationRecord 9998174
    Louisville Plant Quarry & Mill · 2500002

    30 CFR 56.14100(b) · $193.00 proposed penalty

  19. Safe access.

    violationRecord 9998169
    Louisville Plant Quarry & Mill · 2500002

    30 CFR 56.11001 · $642.00 proposed penalty

  20. Construction and maintenance of ladders.

    violationRecord 9998168
    Louisville Plant Quarry & Mill · 2500002

    30 CFR 56.11003 · $193.00 proposed penalty

  21. Inspection.

    violationRecord 9998167
    Louisville Plant Quarry & Mill · 2500002

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

  22. Safety defects; examination, correction and records.

    violationRecord 9998166
    Louisville Plant Quarry & Mill · 2500002

    30 CFR 56.14100(b) · $193.00 proposed penalty

  23. Safety defects; examination, correction and records.

    violationRecord 9998165
    Louisville Plant Quarry & Mill · 2500002

    30 CFR 56.14100(b) · $193.00 proposed penalty

  24. Spillage and leakage.

    violationRecord 9998164
    Louisville Plant Quarry & Mill · 2500002

    30 CFR 56.4102 · $151.00 proposed penalty

  25. Safety belts and lines.

    violationRecord 9766725
    Louisville Plant Quarry & Mill · 2500002

    30 CFR 56.15005 · Significant and substantial (S&S) · $2,133.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.