CRH PLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Safety defects; examination, correction and records.
Louisville Plant Quarry & Mill · 250000230 CFR 56.14100(b) · $193.00 proposed penalty
Safety defects; examination, correction and records.
Louisville Plant Quarry & Mill · 250000230 CFR 56.14100(b) · $151.00 proposed penalty
Housekeeping.
Louisville Plant Quarry & Mill · 250000230 CFR 56.20003(b) · $151.00 proposed penalty
Housekeeping.
Louisville Plant Quarry & Mill · 250000230 CFR 56.20003(a) · Significant and substantial (S&S) · $959.00 proposed penalty
First-aid materials.
Louisville Plant Quarry & Mill · 250000230 CFR 56.15001 · $151.00 proposed penalty
Battery-charging stations.
Louisville Plant Quarry & Mill · 250000230 CFR 56.4502(c) · $151.00 proposed penalty
Parking procedures for unattended equipment.
Louisville Plant Quarry & Mill · 250000230 CFR 56.14207 · $432.00 proposed penalty
Site-specific hazard awareness training.
Louisville Plant Quarry & Mill · 250000230 CFR 46.11(b) · Significant and substantial (S&S) · $7,872.00 proposed penalty
Access to stationary electrical equipment or switchgear.
Louisville Plant Quarry & Mill · 250000230 CFR 56.12019 · $432.00 proposed penalty
Housekeeping.
Louisville Plant Quarry & Mill · 250000230 CFR 56.20003(b) · $151.00 proposed penalty
Magazine requirements.
Louisville Plant Quarry & Mill · 250000230 CFR 56.6132(b) · $151.00 proposed penalty
Safe access.
DICKENSONVILLE PLANT · 440716830 CFR 56.11001 · Significant and substantial (S&S) · $959.00 proposed penalty
Equipment defects.
DICKENSONVILLE PLANT · 440716830 CFR 56.7002 · $151.00 proposed penalty
Safety defects; examination, correction and records.
DICKENSONVILLE PLANT · 440716830 CFR 56.14100(b) · $151.00 proposed penalty
Examination of ground conditions.
DICKENSONVILLE PLANT · 440716830 CFR 56.3401 · Significant and substantial (S&S) · $3,538.00 proposed penalty
Wall, bank, and slope stability.
DICKENSONVILLE PLANT · 440716830 CFR 56.3130 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Safe access.
DICKENSONVILLE PLANT · 440716830 CFR 56.11001 · $959.00 proposed penalty
Guarding around lights.
DICKENSONVILLE PLANT · 440716830 CFR 56.12034 · $151.00 proposed penalty
Housekeeping.
DICKENSONVILLE PLANT · 440716830 CFR 56.20003(a) · $288.00 proposed penalty
Flying or falling materials.
DICKENSONVILLE PLANT · 440716830 CFR 56.14110 · $959.00 proposed penalty
Regular Safety and Health Inspection
Portable Crusher #4 · 050487511.8 on-site hours reported
Regular Safety and Health Inspection
Casey Stone Company · 15000127.0 on-site hours reported
Regular Safety and Health Inspection
Wells Quarry C624 · 17002187.3 on-site hours reported
Regular Safety and Health Inspection
Blackhawk Pit and Plant · 22002196.0 on-site hours reported
Regular Safety and Health Inspection
Howard Plant · 30027546.8 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.