CRH PLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Moving machine parts.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.14107(a) · Significant and substantial (S&S) · $883.00 proposed penalty
Construction and maintenance of guards.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.14112(b) · $549.00 proposed penalty
Safety defects; examination, correction and records.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.14100(b) · $177.00 proposed penalty
Inspection.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.4201(a)(1) · $151.00 proposed penalty
Moving machine parts.
Gore Quarry · 340171330 CFR 56.14107(a) · $151.00 proposed penalty
Construction and maintenance of ladders.
Gore Quarry · 340171330 CFR 56.11003 · $151.00 proposed penalty
Housekeeping.
Sand Products of Monterey · 400316830 CFR 56.20003(a) · $151.00 proposed penalty
Moving machine parts.
Sand Products of Monterey · 400316830 CFR 56.14107(a) · $151.00 proposed penalty
Construction and maintenance of guards.
Hunter Cement Plant · 410282030 CFR 56.14112(a)(1) · $1,037.00 proposed penalty
Moving machine parts.
Hunter Cement Plant · 410282030 CFR 56.14107(a) · $465.00 proposed penalty
Safety defects; examination, correction and records.
Pounding Mill Plant · 440009530 CFR 56.14100(c) · Significant and substantial (S&S) · $151.00 proposed penalty
General requirements.
Pounding Mill Plant · 440009530 CFR 56.4200(b)(2) · $151.00 proposed penalty
Records of training.
East Valley · 450374430 CFR 46.9(b)(5) · $336.00 proposed penalty
Parking procedures for unattended equipment.
East Valley · 450374430 CFR 56.14207 · $4,047.00 proposed penalty
Handling of materials
RiverBend Materials Corvallis · 3502705Dys awy frm wrk & restrctd act
Accident narrative
While attempting to clear rock from underneath the conveyer, the employee slipped and caught themselves by grabbing onto the conveyer guard. The abrupt motion caused their torso to twist resulting in lower back/abdominal pain.
Other
Mt Holly Quarry · 3603215Injuries due to natural causes
Accident narrative
Employee experienced a personal medical emergency on the mine site resulting in hospitalization. (Infection in EE's leg)
Spot Inspection
DON C. RUSHING · 15042727.0 on-site hours reported
Spot Inspection
PULASKI STONE COMPANY · 15190924.0 on-site hours reported
Regular Safety and Health Inspection
Randolph Plant #9 · 23006954.0 on-site hours reported
Verbal Hazard Complaint Inspections
CLINTON POINT QUARRY & MILL · 30000823.0 on-site hours reported
Regular Safety and Health Inspection
Hunter Cement Plant · 410282058.0 on-site hours reported
Regular Safety and Health Inspection
Pounding Mill Plant · 440009525.5 on-site hours reported
Regular Safety and Health Inspection
East Valley · 45037447.3 on-site hours reported
Electrical conductors.
Randolph Plant #9 · 230069530 CFR 56.12004 · $151.00 proposed penalty
Exposure monitoring.
Louisville Plant Quarry & Mill · 250000230 CFR 56.5002 · $465.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.