CRH PLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Brakes.
Pine Mountain Stone · 150005630 CFR 56.14101(a)(2) · $151.00 proposed penalty
Moving machine parts.
Pine Mountain Stone · 150005630 CFR 56.14107(a) · $336.00 proposed penalty
Moving machine parts.
Pine Mountain Stone · 150005630 CFR 56.14107(a) · $336.00 proposed penalty
Availability of mine rescue teams.
Fultonham Plant · 330004230 CFR 49.2(b) · $432.00 proposed penalty
Retaining dams.
East Petersburg Quarry · 360002330 CFR 56.20010 · $592.00 proposed penalty
Handrails and toeboards.
Pine Mountain Stone · 150005630 CFR 56.11002 · $267.00 proposed penalty
Housekeeping.
East Petersburg Quarry · 360002330 CFR 56.20003(a) · $209.00 proposed penalty
New miner training.
East Petersburg Quarry · 360002330 CFR 46.5(b) · $233.00 proposed penalty
Regular Safety and Health Inspection
Moscow · 200309012.5 on-site hours reported
Records of training.
Ralston Quarry · 050300730 CFR 46.9(d)(3) · $151.00 proposed penalty
Locking transformer enclosures.
Ralston Quarry · 050300730 CFR 56.12068 · $151.00 proposed penalty
Electrical conductors.
Tower Quarry · 120143830 CFR 56.12004 · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Ames Plant · 130101930 CFR 50.30(a) · $151.00 proposed penalty
Protection for openings around travelways.
Moscow · 200309030 CFR 56.11012 · $151.00 proposed penalty
Flying or falling materials.
Moscow · 200309030 CFR 56.14110 · $151.00 proposed penalty
Safe access.
MARBLE CLIFF QUARRY · 330009730 CFR 57.11001 · $313.00 proposed penalty
Electrical conductors.
MARBLE CLIFF QUARRY · 330009730 CFR 57.12004 · $151.00 proposed penalty
Illumination of surface working areas.
MARBLE CLIFF QUARRY · 330009730 CFR 57.17001 · $313.00 proposed penalty
Correction of hazardous conditions.
East Petersburg Quarry · 360002330 CFR 56.3200 · $177.00 proposed penalty
Safety defects; examination, correction and records.
PRESCOTT QUARRY · 360003930 CFR 56.14100(b) · $151.00 proposed penalty
Moving machine parts.
PRESCOTT QUARRY · 360003930 CFR 56.14107(a) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
Hunter Cement Plant · 410282030 CFR 56.12008 · $245.00 proposed penalty
Inspection and cover plates.
Hunter Cement Plant · 410282030 CFR 56.12032 · $245.00 proposed penalty
Housekeeping.
Hunter Cement Plant · 410282030 CFR 56.20003(a) · $245.00 proposed penalty
Housekeeping.
Hunter Cement Plant · 410282030 CFR 56.20003(a) · $245.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.