CRH PLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Moving machine parts.
Durkee Cement Plant · 350297030 CFR 56.14107(a) · $267.00 proposed penalty
Regular Safety and Health Inspection
CR4 · 05046565.3 on-site hours reported
Regular Safety and Health Inspection
RiverBend Materials Turner South · 350100212.3 on-site hours reported
Safety defects; examination, correction and records.
CR4 · 050465630 CFR 56.14100(b) · $151.00 proposed penalty
Illumination of surface working areas.
Charlestown Quarry · 120172030 CFR 56.17001 · $151.00 proposed penalty
Regular Safety and Health Inspection
Stoneco Portable #2 · 200308510.5 on-site hours reported
Verbal Hazard Complaint Inspections
Louisville Plant Quarry & Mill · 25000023.0 on-site hours reported
Electrical conductors.
Mount Hope Quarry · 280002630 CFR 56.12004 · $151.00 proposed penalty
Construction and maintenance of guards.
Portable Plant · 350378230 CFR 56.14112(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
Stoneco Angola Pit · 120091410.0 on-site hours reported
Regular Safety and Health Inspection
Dunn Pit · 22008315.8 on-site hours reported
Regular Safety and Health Inspection
Knight Settlement Sand & Gravel LLC · 30012896.0 on-site hours reported
Regular Safety and Health Inspection
RENO PLANT SITE · 33047036.5 on-site hours reported
Regular Safety and Health Inspection
Portable Plant · 35037829.5 on-site hours reported
Changes; notification by operator.
P & R Mining · 010282230 CFR 41.12 · $151.00 proposed penalty
Securing gas cylinders.
P & R Mining · 010282230 CFR 56.16005 · $151.00 proposed penalty
Construction and maintenance of guards.
P & R Mining · 010282230 CFR 56.14112(b) · $151.00 proposed penalty
Berms or guardrails.
P & R Mining · 010282230 CFR 56.9300(a) · Significant and substantial (S&S) · $366.00 proposed penalty
Moving machine parts.
P & R Mining · 010282230 CFR 56.14107(b) · $151.00 proposed penalty
Housekeeping.
P & R Mining · 010282230 CFR 56.20003(a) · Significant and substantial (S&S) · $366.00 proposed penalty
Construction and maintenance of guards.
Mount Hope Quarry · 280002630 CFR 56.14112(b) · $151.00 proposed penalty
Horns and backup alarms.
Coshocton Plant · 330140830 CFR 56.14132(b)(1)(i) · $151.00 proposed penalty
Inspection.
Coshocton Plant · 330140830 CFR 56.4201(a)(2) · $165.00 proposed penalty
Handling of materials
Jefferson Materials Co · 3301526Days away from work only
Accident narrative
Standing at ground level putting a bar back on grizzly screen. Was trying to guide the bar in to the bolt holes, lost footing and fell back to the ground and the bar fell on employee. Lower back/butt sore.
Regular Safety and Health Inspection
P & R Mining · 010282220.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.