CRH PLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Foreman Quarry & Plant · 030025686.3 on-site hours reported
Closure of valves.
Foreman Quarry & Plant · 030025630 CFR 56.4603 · $642.00 proposed penalty
Moving machine parts.
Foreman Quarry & Plant · 030025630 CFR 56.14107(a) · $959.00 proposed penalty
Identification of power switches.
Foreman Quarry & Plant · 030025630 CFR 56.12018 · $642.00 proposed penalty
Construction and maintenance of guards.
Foreman Quarry & Plant · 030025630 CFR 56.14112(b) · Significant and substantial (S&S) · $17,082.00 proposed penalty
Housekeeping.
Foreman Quarry & Plant · 030025630 CFR 56.20003(a) · Significant and substantial (S&S) · $13,436.00 proposed penalty
Inspection and cover plates.
Foreman Quarry & Plant · 030025630 CFR 56.12032 · $642.00 proposed penalty
Housekeeping.
Foreman Quarry & Plant · 030025630 CFR 56.20003(a) · $2,712.00 proposed penalty
Safety defects; examination, correction and records.
Foreman Quarry & Plant · 030025630 CFR 56.14100(b) · $642.00 proposed penalty
Housekeeping.
Foreman Quarry & Plant · 030025630 CFR 56.20003(a) · $2,712.00 proposed penalty
Housekeeping.
Foreman Quarry & Plant · 030025630 CFR 56.20003(a) · $2,712.00 proposed penalty
Inspection.
Foreman Quarry & Plant · 030025630 CFR 56.4201(a)(1) · $642.00 proposed penalty
Construction and maintenance of guards.
Foreman Quarry & Plant · 030025630 CFR 56.14112(b) · $2,312.00 proposed penalty
Construction and maintenance of guards.
Foreman Quarry & Plant · 030025630 CFR 56.14112(b) · $2,312.00 proposed penalty
High-pressure hose connections.
Foreman Quarry & Plant · 030025630 CFR 56.13021 · $642.00 proposed penalty
Berms or guardrails.
Foreman Quarry & Plant · 030025630 CFR 56.9300(b) · $3,184.00 proposed penalty
Housekeeping.
Foreman Quarry & Plant · 030025630 CFR 56.20003(a) · $2,712.00 proposed penalty
Construction and maintenance of guards.
Foreman Quarry & Plant · 030025630 CFR 56.14112(b) · $2,312.00 proposed penalty
Slip or fall of person
Waynesville Quarry · 3100400Days restricted activity only
Accident narrative
Employee was tightening bolts on crane wench. Socket came off bolt and employee contacted ground. CT scan positive for LT pelvis fracture.
Brakes.
Roberts Quarry · 340113030 CFR 56.14101(a)(2) · $151.00 proposed penalty
Powered haulage
Hunter Cement Plant · 4102820Fatality
Accident narrative
Third party delivery driver of raw materials was found deceased trapped between the frame and dump bed of EE's I-Bar owned and operated delivery truck. The driver was located on the West edge of the iron ore stockpile.
Regular Safety and Health Inspection
SOUTH BETHLEHEM · 300001310.5 on-site hours reported
Fatal Accident Investigation
Hunter Cement Plant · 410282023.3 on-site hours reported
Construction and maintenance of guards.
Roberts Quarry · 340113030 CFR 56.14112(b) · $151.00 proposed penalty
Warning signs.
Roberts Quarry · 340113030 CFR 56.4101 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.