CRH PLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Protective equipment and clothing for hazards and irritants.
Columbus Limestone · 330465730 CFR 56.15006 · Significant and substantial (S&S) · $165.00 proposed penalty
Horns and backup alarms.
Brigham City Pit · 420039830 CFR 56.14132(a) · $1,126.00 proposed penalty
Identification of power switches.
Brigham City Pit · 420039830 CFR 56.12018 · $1,126.00 proposed penalty
Moving machine parts.
Brigham City Pit · 420039830 CFR 56.14107(a) · $2,312.00 proposed penalty
Inspection.
Brigham City Pit · 420039830 CFR 56.4201(a)(2) · $336.00 proposed penalty
Self-propelled equipment.
Beck Street · 420145230 CFR 56.4230(a)(1) · $151.00 proposed penalty
Safe access.
Castlewood · 440742430 CFR 56.11001 · $755.00 proposed penalty
Regular Safety and Health Inspection
VOSSBURG PIT · 22004933.3 on-site hours reported
Impoundment Spot Inspection
Stoneco, Inc. · 33001815.0 on-site hours reported
Retaining dams.
Stoneco, Inc. · 330018130 CFR 56.20010 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Cape Sandy #1 · 120008430 CFR 56.14100(b) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Mount Hope Quarry · 280002630 CFR 56.14100(b) · $151.00 proposed penalty
Moving machine parts.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.14107(a) · $1,818.00 proposed penalty
Inspection and cover plates.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.12032 · $288.00 proposed penalty
Construction and maintenance of guards.
CLINTON POINT QUARRY & MILL · 300008230 CFR 56.14112(b) · $1,550.00 proposed penalty
Examination of working places.
Waynesville Quarry · 310040030 CFR 56.18002(a) · $151.00 proposed penalty
Identification of power switches.
Stoneco, Inc. · 330018130 CFR 56.12018 · $151.00 proposed penalty
Correction of hazardous conditions.
Columbus Limestone · 330465730 CFR 56.3200 · Significant and substantial (S&S) · $5,144.00 proposed penalty
Changes; notification by operator.
Columbus Limestone · 330465730 CFR 41.12 · $151.00 proposed penalty
Examination of working places.
Columbus Limestone · 330465730 CFR 56.18002(b) · $151.00 proposed penalty
Examination of ground conditions.
Columbus Limestone · 330465730 CFR 56.3401 · Significant and substantial (S&S) · $5,144.00 proposed penalty
Closure of valves.
Plant #17 Indian Road · 340180530 CFR 56.4603(c) · $151.00 proposed penalty
Regular Safety and Health Inspection
Wash Plant 2 · 05049997.5 on-site hours reported
Regular Safety and Health Inspection
Waynesville Quarry · 310040010.5 on-site hours reported
Regular Safety and Health Inspection
Plant #17 Indian Road · 34018056.3 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.