Coeur Mining, Inc. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Controls and switches.
Coeur Wharf · 390128230 CFR 56.12002 · $151.00 proposed penalty
Construction and maintenance of guards.
Coeur Wharf · 390128230 CFR 56.14112(a)(1) · $151.00 proposed penalty
Construction and maintenance of ladders.
Coeur Wharf · 390128230 CFR 56.11003 · $151.00 proposed penalty
Moving machine parts.
Coeur Wharf · 390128230 CFR 56.14107(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Coeur Wharf · 390128230 CFR 56.14100(c) · $177.00 proposed penalty
Barricades and warning signs.
Coeur Wharf · 390128230 CFR 56.20011 · $151.00 proposed penalty
Inspection and cover plates.
Coeur Wharf · 390128230 CFR 56.12032 · $592.00 proposed penalty
Regular Safety and Health Inspection
Coeur Wharf · 3901282121.8 on-site hours reported
Powered haulage
Kensington · 5001544Days away from work only
Accident narrative
Two vehicles traveling on a one lane road in opposite directions did not hear each other on the radio and made contact at a blind corner. The employee was already planning on getting knee replacement surgery sometime this fall but this incident made the decision EE was going to do it sooner. We did not know this was going to be a work comp claim until 4/29/26.
Records of training.
Coeur Wharf · 390128230 CFR 48.29(c) · $151.00 proposed penalty
Records of training.
Coeur Wharf · 390128230 CFR 48.29(a) · $151.00 proposed penalty
Spot Inspection
Rochester Mine · 26019413.0 on-site hours reported
Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.
Rochester Mine · 260194130 CFR 50.20(a) · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
Rochester Mine · 26019410.8 on-site hours reported
Impoundment Spot Inspection
Coeur Wharf · 39012826.0 on-site hours reported
Requirement for container labels.
Rochester Mine · 260194130 CFR 47.41(a)(1) · $151.00 proposed penalty
Parking procedures for unattended equipment.
Rochester Mine · 260194130 CFR 56.14207 · $151.00 proposed penalty
Requirement for container labels.
Rochester Mine · 260194130 CFR 47.41(a)(1) · $151.00 proposed penalty
Inspection.
Rochester Mine · 260194130 CFR 56.4201(a)(2) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Rochester Mine · 260194130 CFR 56.14100(b) · $151.00 proposed penalty
Construction and maintenance of guards.
Rochester Mine · 260194130 CFR 56.14112(b) · $151.00 proposed penalty
Identification of power switches.
Rochester Mine · 260194130 CFR 56.12018 · $151.00 proposed penalty
Identification of power switches.
Rochester Mine · 260194130 CFR 56.12018 · $151.00 proposed penalty
Identification of power switches.
Rochester Mine · 260194130 CFR 56.12018 · $151.00 proposed penalty
Inspection and cover plates.
Rochester Mine · 260194130 CFR 56.12032 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.