Cleveland-Cliffs Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Electric equipment; examination, testing and maintenance.
MINE NO. 44 · 460952330 CFR 75.512 · $193.00 proposed penalty
Mine ventilation plan; submission and approval.
MINE NO. 44 · 460952330 CFR 75.370(a)(1) · $177.00 proposed penalty
Electric equipment; examination, testing and maintenance.
MINE NO. 44 · 460952330 CFR 75.512 · $193.00 proposed penalty
Testing grounding systems.
United Plant · 210340430 CFR 56.12028 · $642.00 proposed penalty
Loading and haulage equipment; installations.
Eckman Surface Mine · 460864730 CFR 77.1605(d) · $151.00 proposed penalty
Accumulations of combustible materials.
Eckman Surface Mine · 460864730 CFR 77.1104 · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Eckman Surface Mine · 460864730 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Eckman Surface Mine · 460864730 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Eckman Surface Mine · 460864730 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; installations.
Eckman Surface Mine · 460864730 CFR 77.1605(d) · $151.00 proposed penalty
Correction of dangerous conditions.
United Plant · 210340430 CFR 56.12030 · $504.00 proposed penalty
Compliance Follow-up Inspection
Northshore Mining Company · 21008312.0 on-site hours reported
Inspection.
United Plant · 210340430 CFR 56.4201(b) · $151.00 proposed penalty
Handling of materials
Tilden Mine · 2000422Days restricted activity only
Accident narrative
Employee reported pain in their left shoulder while moving a case of boosters from a service truck to a cart. Employee was later prescribed restrictions 4-17-2025.
Maintenance of belt conveyors and belt conveyor entries.
MINE NO. 44 · 460952330 CFR 75.1731(a) · $151.00 proposed penalty
Accumulation of combustible materials.
MINE NO. 44 · 460952330 CFR 75.400 · $177.00 proposed penalty
Cable fittings; suitability.
MINE NO. 44 · 460952330 CFR 75.515 · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
MINE NO. 44 · 460952330 CFR 75.1725(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Regular Safety and Health Inspection
Eckman Surface Mine · 460864788.8 on-site hours reported
Stairstep clearance.
United Plant · 210340430 CFR 56.11010 · $151.00 proposed penalty
Identification of power switches.
United Plant · 210340430 CFR 56.12018 · $288.00 proposed penalty
Electric substations and liquid storage facilities.
Northshore Mining Company · 210020930 CFR 56.4130(b) · $209.00 proposed penalty
Locking transformer enclosures.
Northshore Mining Company · 210020930 CFR 56.12068 · $313.00 proposed penalty
Electrical conductors.
Northshore Mining Company · 210020930 CFR 56.12004 · $313.00 proposed penalty
Permissible electric face equipment; maintenance.
MINE NO. 44 · 460952330 CFR 75.503 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.