Cleveland-Cliffs Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Roof control plan.
MINE NO. 44 · 460952330 CFR 75.220(a)(1) · $209.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Eckman Surface Mine · 460864730 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Eckman Surface Mine · 460864730 CFR 77.1606(c) · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
Eckman Surface Mine · 460864730 CFR 77.410(a)(1) · $151.00 proposed penalty
Loading and haulage equipment; installations.
Dry Branch Surface Mine · 460939530 CFR 77.1605(d) · $504.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Dry Branch Surface Mine · 460939530 CFR 77.1606(c) · $504.00 proposed penalty
Parking procedures for unattended equipment.
Tilden Mine · 200042230 CFR 56.14207 · $336.00 proposed penalty
Safety defects; examination, correction and records.
Tilden Mine · 200042230 CFR 56.14100(c) · Significant and substantial (S&S) · $6,540.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Dry Branch Surface Mine · 460939530 CFR 77.1606(c) · $504.00 proposed penalty
Highwalls, pits and spoil banks; plans.
Dry Branch Surface Mine · 460939530 CFR 77.1000 · Significant and substantial (S&S) · $697.00 proposed penalty
Locking transformer enclosures.
Tilden Mine · 200042230 CFR 56.12068 · $288.00 proposed penalty
Safety defects; examination, correction and records.
Tilden Mine · 200042230 CFR 56.14100(a) · $288.00 proposed penalty
Guy wires.
Tilden Mine · 200042230 CFR 56.12047 · $288.00 proposed penalty
Parking procedures for unattended equipment.
Tilden Mine · 200042230 CFR 56.14207 · $959.00 proposed penalty
Drill dust control at surface mines and surface areas of underground mines.
Eckman Surface Mine · 460864730 CFR 72.620 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Eckman Surface Mine · 460864730 CFR 77.1606(c) · $165.00 proposed penalty
Barricades and warning signs.
Tilden Mine · 200042230 CFR 56.20011 · $642.00 proposed penalty
Insulation and fittings for power wires and cables.
Tilden Mine · 200042230 CFR 56.12008 · $642.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Eckman Surface Mine · 460864730 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
MINE NO. 44 · 460952330 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
MINE NO. 44 · 460952330 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
MINE NO. 44 · 460952330 CFR 77.1606(c) · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
MINE NO. 44 · 460952330 CFR 77.410(b) · $151.00 proposed penalty
Examination of working places.
Tilden Mine · 200042230 CFR 56.18002(d) · $642.00 proposed penalty
Traffic control.
Tilden Mine · 200042230 CFR 56.9100 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.