Cleveland-Cliffs Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Testing grounding systems.
Tilden Mine · 200042230 CFR 56.12028 · $288.00 proposed penalty
Electrical conductors.
Tilden Mine · 200042230 CFR 56.12004 · $245.00 proposed penalty
Housekeeping.
Tilden Mine · 200042230 CFR 56.20003(a) · Significant and substantial (S&S) · $7,084.00 proposed penalty
Scaffolds and working platforms.
Tilden Mine · 200042230 CFR 56.11027 · $177.00 proposed penalty
Access to stationary electrical equipment or switchgear.
Tilden Mine · 200042230 CFR 56.12019 · $245.00 proposed penalty
Protection for openings around travelways.
Tilden Mine · 200042230 CFR 56.11012 · $592.00 proposed penalty
Construction and maintenance of guards.
Tilden Mine · 200042230 CFR 56.14112(b) · $2,503.00 proposed penalty
Housekeeping.
Tilden Mine · 200042230 CFR 56.20003(a) · $642.00 proposed penalty
Inspection and cover plates.
Tilden Mine · 200042230 CFR 56.12032 · $245.00 proposed penalty
Construction and maintenance of ladders.
Tilden Mine · 200042230 CFR 56.11003 · $267.00 proposed penalty
Electrical conductors.
Tilden Mine · 200042230 CFR 56.12004 · $245.00 proposed penalty
Inspection.
Tilden Mine · 200042230 CFR 56.4201(a) · Significant and substantial (S&S) · $32,395.00 proposed penalty
Spot Inspection
Eckman Plant · 46093576.0 on-site hours reported
Combustible waste.
Tilden Mine · 200042230 CFR 56.4104(b) · $177.00 proposed penalty
Testing grounding systems.
Tilden Mine · 200042230 CFR 56.12028 · $288.00 proposed penalty
Electrical conductors.
Tilden Mine · 200042230 CFR 56.12004 · $245.00 proposed penalty
Temporary, portable containers.
Tilden Mine · 200042230 CFR 47.44(b) · $267.00 proposed penalty
Combustible waste.
Tilden Mine · 200042230 CFR 56.4104(b) · $177.00 proposed penalty
Construction and maintenance of guards.
Tilden Mine · 200042230 CFR 56.14112(b) · $504.00 proposed penalty
Loading and haulage equipment; operation.
Eckman Plant · 460935730 CFR 77.1607(p) · $151.00 proposed penalty
Electrical connections or splices; suitability.
MINE NO. 44 · 460952330 CFR 75.514 · Significant and substantial (S&S) · $549.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Dry Branch Surface Mine · 460939530 CFR 77.1606(c) · $165.00 proposed penalty
Examination and maintenance of firefighting equipment.
Dry Branch Surface Mine · 460939530 CFR 77.1110 · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
MINE NO. 44 · 460952330 CFR 75.403 · $151.00 proposed penalty
Construction and maintenance of guards.
Tilden Mine · 200042230 CFR 56.14112(b) · $549.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.