Waste receptacles.
Tilden Mine · 200042230 CFR 56.20013 · $177.00 proposed penalty
Electrical conductors.
Tilden Mine · 200042230 CFR 56.12004 · Significant and substantial (S&S) · $1,320.00 proposed penalty
Testing grounding systems.
Northshore Mining Company · 210083130 CFR 56.12028 · $642.00 proposed penalty
Construction and maintenance of guards.
Northshore Mining Company · 210083130 CFR 56.14112(a)(2) · $336.00 proposed penalty
Housekeeping.
Northshore Mining Company · 210083130 CFR 56.20003(c) · $226.00 proposed penalty
Housekeeping.
Northshore Mining Company · 210083130 CFR 56.20003(c) · $151.00 proposed penalty
Housekeeping.
Northshore Mining Company · 210083130 CFR 56.20003(b) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Housekeeping.
Northshore Mining Company · 210083130 CFR 56.20003(b) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Housekeeping.
United Plant · 210340430 CFR 56.20003(b) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Housekeeping.
United Plant · 210340430 CFR 56.20003(a) · $209.00 proposed penalty
Housekeeping.
United Plant · 210340430 CFR 56.20003(b) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Mine ventilation plan; submission and approval.
MINE NO. 44 · 460952330 CFR 75.370(a)(1) · $2,712.00 proposed penalty
Permissible electric face equipment; maintenance.
MINE NO. 44 · 460952330 CFR 75.503 · $592.00 proposed penalty
Power wires and cables; insulation and protection.
MINE NO. 44 · 460952330 CFR 75.517 · $209.00 proposed penalty
Flying or falling materials.
Tilden Mine · 200042230 CFR 56.14110 · Significant and substantial (S&S) · $883.00 proposed penalty
Housekeeping.
Tilden Mine · 200042230 CFR 56.20003(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Inspection.
Tilden Mine · 200042230 CFR 56.4201(a)(1) · $288.00 proposed penalty
Spillage and leakage.
Tilden Mine · 200042230 CFR 56.4102 · $366.00 proposed penalty
Protection of persons at switchgear.
Tilden Mine · 200042230 CFR 56.12020 · $592.00 proposed penalty
Housekeeping.
United Plant · 210340430 CFR 56.20003(a) · $465.00 proposed penalty
Housekeeping.
United Plant · 210340430 CFR 56.20003(b) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Flying or falling materials.
United Plant · 210340430 CFR 56.14110 · Significant and substantial (S&S) · $432.00 proposed penalty
Housekeeping.
United Plant · 210340430 CFR 56.20003(b) · $504.00 proposed penalty
Other
United Plant · 2103404No dys awy frm wrk,no rstr act
Accident narrative
While conducting tailings dam safety inspections, the wind increased, causing increasingly dusty conditions, resulting in dust getting into the employee's eye.
Handtools (nonpowered)
Dry Branch Surface Mine · 4609395No dys awy frm wrk,no rstr act
Accident narrative
Employee was using a pry bar to adjust hoist cylinder, when the bar slipped and struck EE's mouth and broke a tooth.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.