Cheryl Danner safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Compliance Follow-up Inspection
42 Pit · 21031655.5 on-site hours reported
Eye protection when operating grinding wheels.
42 Pit · 210316530 CFR 56.15014 · Significant and substantial (S&S) · $165.00 proposed penalty
Construction and maintenance of guards.
42 Pit · 210316530 CFR 56.14112(b) · Significant and substantial (S&S) · $151.00 proposed penalty
Roll-over protective structures (ROPS) and seat belts.
42 Pit · 210316530 CFR 56.14130(g) · Significant and substantial (S&S) · $151.00 proposed penalty
Compliance Follow-up Inspection
42 Pit · 21031658.5 on-site hours reported
Record and inspection.
42 Pit · 210316530 CFR 56.23004(a) · $151.00 proposed penalty
Examination of working places.
42 Pit · 210316530 CFR 56.18002(a) · $151.00 proposed penalty
General requirements.
42 Pit · 210316530 CFR 56.4200(a)(1) · $151.00 proposed penalty
First-aid materials.
42 Pit · 210316530 CFR 56.15001 · $151.00 proposed penalty
Testing grounding systems.
42 Pit · 210316530 CFR 56.12028 · $151.00 proposed penalty
Requirement for a HazCom program.
42 Pit · 210316530 CFR 47.31(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
42 Pit · 210316511.3 on-site hours reported
Notification of commencement of operations and closing of mines.
42 Pit · 210316530 CFR 56.1000 · $151.00 proposed penalty
Handrails and toeboards.
42 Pit · 210316530 CFR 56.11002 · Significant and substantial (S&S) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
42 Pit · 210316530 CFR 56.12008 · $151.00 proposed penalty
Roll-over protective structures (ROPS) and seat belts.
42 Pit · 210316530 CFR 56.14130(a)(3) · Significant and substantial (S&S) · $151.00 proposed penalty
Training plans.
42 Pit · 210316530 CFR 46.3(a) · $151.00 proposed penalty
New miner training.
42 Pit · 210316530 CFR 46.5(a) · Significant and substantial (S&S) · $610.00 proposed penalty
Identification of power switches.
42 Pit · 210316530 CFR 56.12018 · $151.00 proposed penalty
Securing movable parts.
42 Pit · 210316530 CFR 56.14206(b) · $151.00 proposed penalty
Safe access.
42 Pit · 210316530 CFR 56.11001 · Significant and substantial (S&S) · $165.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.