Regular Safety and Health Inspection
CEMEX-PIMA · 02026707.0 on-site hours reported
Safety defects; examination, correction and records.
CEMEX-PIMA · 020267030 CFR 56.14100(b) · Significant and substantial (S&S) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Ponce Cement Plant · 540000130 CFR 56.14100(b) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Compliance Follow-up Inspection
Brooksville South Cement Plant · 08012872.5 on-site hours reported
Barricades and warning signs.
CEMEX-19TH AVE · 020098830 CFR 56.20011 · $549.00 proposed penalty
Safe access.
Moorpark Quarry · 040414030 CFR 56.11001 · $151.00 proposed penalty
Brakes.
Knoxville Cement Plant · 400084030 CFR 56.14101(a)(1) · $151.00 proposed penalty
Inspection.
Knoxville Cement Plant · 400084030 CFR 56.4201(a)(1) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Knoxville Cement Plant · 400084030 CFR 56.14100(b) · $151.00 proposed penalty
Moving machine parts.
Ponce Cement Plant · 540000130 CFR 56.14107(a) · $245.00 proposed penalty
Safety defects; examination, correction and records.
Ponce Cement Plant · 540000130 CFR 56.14100(b) · $818.00 proposed penalty
Safety defects; examination, correction and records.
Ponce Cement Plant · 540000130 CFR 56.14100(b) · $151.00 proposed penalty
Safe access.
Ponce Cement Plant · 540000130 CFR 56.11001 · $151.00 proposed penalty
Illumination of surface working areas.
Ponce Cement Plant · 540000130 CFR 56.17001 · $366.00 proposed penalty
Spot Inspection
Moorpark Quarry · 04041402.5 on-site hours reported
Changes; notification by operator.
CEMEX-19TH AVE · 020098830 CFR 41.12 · $151.00 proposed penalty
Dump site restraints.
CEMEX-19TH AVE · 020098830 CFR 56.9301 · Significant and substantial (S&S) · $336.00 proposed penalty
Moving machine parts.
Clayton Plant · 040017330 CFR 56.14107(a) · $151.00 proposed penalty
Inspection.
Knoxville Cement Plant · 400084030 CFR 56.4201(a)(1) · $151.00 proposed penalty
Brakes.
Knoxville Cement Plant · 400084030 CFR 56.14101(a)(1)
Distribution boxes.
Knoxville Cement Plant · 400084030 CFR 56.12006 · $151.00 proposed penalty
Brakes.
Knoxville Cement Plant · 400084030 CFR 56.14101(a)(1) · $151.00 proposed penalty
Testing grounding systems.
Knoxville Cement Plant · 400084030 CFR 56.12028 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Knoxville Cement Plant · 400084030 CFR 56.14100(b) · $151.00 proposed penalty
Work on power circuits.
Knoxville Cement Plant · 400084030 CFR 56.12017 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.