Exposure monitoring.
Clinchfield Plant · 090005330 CFR 56.5002 · Significant and substantial (S&S) · $883.00 proposed penalty
Housekeeping.
Clinchfield Plant · 090005330 CFR 56.20003(b) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Housekeeping.
Clinchfield Plant · 090005330 CFR 56.20003(b) · Significant and substantial (S&S) · $697.00 proposed penalty
Safe access.
Clinchfield Plant · 090005330 CFR 56.11001 · $818.00 proposed penalty
High-pressure hose connections.
Clinchfield Plant · 090005330 CFR 56.13021 · $245.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
Brooksville South Cement Plant · 08012870.0 on-site hours reported
Combustible waste.
Clinchfield Plant · 090005330 CFR 56.4104(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Clinchfield Plant · 090005361.5 on-site hours reported
Correction of dangerous conditions.
Clinchfield Plant · 090005330 CFR 56.12030 · $288.00 proposed penalty
Housekeeping.
Brooksville South Cement Plant · 080128730 CFR 56.20003(a) · $4,749.00 proposed penalty
Inspection.
Brooksville South Cement Plant · 080128730 CFR 56.4201(a)(1) · $267.00 proposed penalty
Housekeeping.
Brooksville South Cement Plant · 080128730 CFR 56.20003(a) · $959.00 proposed penalty
Safe access.
Brooksville South Cement Plant · 080128730 CFR 56.11001 · $2,712.00 proposed penalty
Guarding electrical connections and resistor grids.
Brooksville South Cement Plant · 080128730 CFR 56.12023 · $1,968.00 proposed penalty
Safe access.
Brooksville South Cement Plant · 080128730 CFR 56.11001 · $1,219.00 proposed penalty
Electrical conductors.
Brooksville South Cement Plant · 080128730 CFR 56.12004 · $267.00 proposed penalty
Verbal Hazard Complaint Inspections
Miami Cement Plant · 08000460.0 on-site hours reported
Safety defects; examination, correction and records.
Brooksville South Cement Plant · 080128730 CFR 56.14100(b) · $1,037.00 proposed penalty
Inspection.
Brooksville South Cement Plant · 080128730 CFR 56.4201(a)(1) · $1,037.00 proposed penalty
Safety belts and lines.
Brooksville South Cement Plant · 080128730 CFR 56.15005 · Significant and substantial (S&S) · $407.00 proposed penalty
Violation — cited standard not reported
Brooksville South Cement Plant · 0801287Housekeeping.
Brooksville South Cement Plant · 080128730 CFR 56.20003(a) · $5,574.00 proposed penalty
Inspection.
Brooksville South Cement Plant · 080128730 CFR 56.4201(a)(2) · $313.00 proposed penalty
Inspection.
Brooksville South Cement Plant · 080128730 CFR 56.4201(a)(1) · $313.00 proposed penalty
Inspection.
Lyons Cement Plant Cemex Inc · 050034430 CFR 56.4201(a)(2) · $366.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.