103 (g) Written Notification Hazard Complaint Inspectio
Balcones Plant · 41028850.8 on-site hours reported
Inspection and cover plates.
Balcones Plant · 410288530 CFR 56.12032 · $1,126.00 proposed penalty
Containers for hazardous materials.
Balcones Plant · 410288530 CFR 56.16004 · $398.00 proposed penalty
Identification of power switches.
Balcones Plant · 410288530 CFR 56.12018 · $592.00 proposed penalty
Handrails and toeboards.
Balcones Plant · 410288530 CFR 56.11002 · $4,383.00 proposed penalty
Inspection and cover plates.
Balcones Plant · 410288530 CFR 56.12032 · $3,736.00 proposed penalty
Grounding transformer and switchgear enclosures.
Cache Creek Quarry · 040276330 CFR 56.12026 · $209.00 proposed penalty
New task training.
Cache Creek Quarry · 040276330 CFR 46.7(a) · $168.00 proposed penalty
Regular Safety and Health Inspection
Cache Creek Quarry · 040276311.5 on-site hours reported
Impoundment Spot Inspection
Brooksville Quarry · 08000245.0 on-site hours reported
Inspection and cover plates.
FEC QUARRY · 080051930 CFR 56.12032 · $151.00 proposed penalty
Handrails and toeboards.
FEC QUARRY · 080051930 CFR 56.11002 · $151.00 proposed penalty
Handrails and toeboards.
FEC QUARRY · 080051930 CFR 56.11002 · $151.00 proposed penalty
Regular Safety and Health Inspection
FEC QUARRY · 080051934.5 on-site hours reported
Safety defects; examination, correction and records.
FEC QUARRY · 080051930 CFR 56.14100(b) · $1,679.00 proposed penalty
Insulation and fittings for power wires and cables.
FEC QUARRY · 080051930 CFR 56.12008 · $313.00 proposed penalty
Compliance Follow-up Inspection
Victorville Cement Plant · 04002813.0 on-site hours reported
Impoundment Spot Inspection
LYTLE CREEK PIT · 04052161.0 on-site hours reported
Training plans; time of submission; where filed; information required; time for approval; method for disapproval; commencement of training; approval of instructors.
LYTLE CREEK PIT · 040521630 CFR 48.23(c)(3) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
LYTLE CREEK PIT · 040521630 CFR 50.30(a) · $151.00 proposed penalty
Machinery
Black Mountain Quarry · 0405701Days restricted activity only
Accident narrative
Hot material flushed from dust collector hopper causing burns on left and right ankles.
Handtools (nonpowered)
St Catherine Mine · 0800075No dys awy frm wrk,no rstr act
Accident narrative
Employee was picking up a backpack that contained a folding knife that had inadvertently deployed. When the employee grasped the backpack, the knife cut the distal phalanx of the right index finger, requiring stitches.
Regular Safety and Health Inspection
LYTLE CREEK PIT · 040521612.8 on-site hours reported
Housekeeping.
LYTLE CREEK PIT · 040521630 CFR 56.20003(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Blum Quarry · 410388230 CFR 50.30(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.