Cemex S A safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Housekeeping.
Brooksville South Cement Plant · 080128730 CFR 56.20003(a) · $2,312.00 proposed penalty
Securing gas cylinders.
Brooksville South Cement Plant · 080128730 CFR 56.16005 · $642.00 proposed penalty
Regular Safety and Health Inspection
CEMEX-APEX · 02025857.0 on-site hours reported
Regular Safety and Health Inspection
CEMEX-GRAY MOUNTAIN · 02028519.0 on-site hours reported
Regular Safety and Health Inspection
Brooksville South Cement Plant · 080128753.8 on-site hours reported
Construction and maintenance of guards.
Brooksville South Cement Plant · 080128730 CFR 56.14112(a)(1) · $642.00 proposed penalty
Illumination of surface working areas.
Brooksville South Cement Plant · 080128730 CFR 56.17001 · $642.00 proposed penalty
Impoundment Spot Inspection
Cache Creek Quarry · 04027632.5 on-site hours reported
Spot Inspection
Clinchfield Plant · 09000532.8 on-site hours reported
Handling of materials
Brooksville South Cement Plant · 0801287Days restricted activity only
Accident narrative
Around 2:30 pm, a mechanic while working in the FM1 separator at the time of positioning a come-a-long above their head, dust got loose and fell into their left eye. They flushed their eye and were taken to Urgent Care where medical evaluated and diagnosed with a corneal abrasion of the left eye, without a foreign body.
Correction of dangerous conditions.
Clinchfield Plant · 090005330 CFR 56.12030 · $755.00 proposed penalty
Securing gas cylinders.
Clinchfield Plant · 090005330 CFR 56.16005 · $165.00 proposed penalty
Securing gas cylinders.
Clinchfield Plant · 090005330 CFR 56.16005 · $226.00 proposed penalty
Safe access.
Clinchfield Plant · 090005330 CFR 56.11001 · $226.00 proposed penalty
Inspection and cover plates.
Clinchfield Plant · 090005330 CFR 56.12032 · $226.00 proposed penalty
Toilet facilities.
Clinchfield Plant · 090005330 CFR 56.20008(b) · $226.00 proposed penalty
Electrical conductors.
Clinchfield Plant · 090005330 CFR 56.12004 · $226.00 proposed penalty
Examination of working places.
Clinchfield Plant · 090005330 CFR 56.18002(b) · $226.00 proposed penalty
Electrical conductors.
Clinchfield Plant · 090005330 CFR 56.12004 · $226.00 proposed penalty
Access to stationary electrical equipment or switchgear.
Clinchfield Plant · 090005330 CFR 56.12019 · $226.00 proposed penalty
Danger signs.
Clinchfield Plant · 090005330 CFR 56.12021 · $755.00 proposed penalty
Danger signs.
Clinchfield Plant · 090005330 CFR 56.12021 · $755.00 proposed penalty
Regular Safety and Health Inspection
CEMEX-COOLIDGE · 02028963.5 on-site hours reported
Identification of power switches.
Clinchfield Plant · 090005330 CFR 56.12018 · $226.00 proposed penalty
Roll-over protective structures (ROPS) and seat belts.
Clinchfield Plant · 090005330 CFR 56.14130(g) · $755.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.