Inspection and cover plates.
Brooksville South Cement Plant · 080128730 CFR 56.12032 · $642.00 proposed penalty
Inspection and cover plates.
Brooksville South Cement Plant · 080128730 CFR 56.12032 · $642.00 proposed penalty
Guarding around lights.
Brooksville South Cement Plant · 080128730 CFR 56.12034 · $642.00 proposed penalty
Inspection and cover plates.
Brooksville South Cement Plant · 080128730 CFR 56.12032 · $642.00 proposed penalty
Electrical conductors.
Brooksville South Cement Plant · 080128730 CFR 56.12004 · $1,679.00 proposed penalty
Safe access.
Brooksville South Cement Plant · 080128730 CFR 56.11001 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Regular Safety and Health Inspection
Brooksville South Cement Plant · 0801287117.3 on-site hours reported
Inspection and cover plates.
Brooksville South Cement Plant · 080128730 CFR 56.12032 · $642.00 proposed penalty
Housekeeping.
Brooksville South Cement Plant · 080128730 CFR 56.20003(a) · $2,712.00 proposed penalty
Identification of power switches.
Clinchfield Plant · 090005330 CFR 56.12018 · $226.00 proposed penalty
Other
Clinchfield Plant · 0900053Injuries involvng nonemployees
Accident narrative
MSHA Inspector was exposed too feed dust during conversation with Cemex employee, MSHA inspector stopped Cemex from preforming their job duties.
Regular Safety and Health Inspection
Cache Creek Quarry · 04027636.3 on-site hours reported
Electrical conductors.
Cache Creek Quarry · 040276330 CFR 56.12004 · $193.00 proposed penalty
Inspection.
Cache Creek Quarry · 040276330 CFR 56.4201(a)(2) · $151.00 proposed penalty
Spillage and leakage.
Clinchfield Plant · 090005330 CFR 56.4102 · $267.00 proposed penalty
Inspection.
Clinchfield Plant · 090005330 CFR 56.4201(a)(1) · $267.00 proposed penalty
Safety defects; examination, correction and records.
Clinchfield Plant · 090005330 CFR 56.14100(c) · $883.00 proposed penalty
Protection of persons at switchgear.
Clinchfield Plant · 090005330 CFR 56.12020 · $267.00 proposed penalty
Combustible waste.
Clinchfield Plant · 090005330 CFR 56.4104(b) · $267.00 proposed penalty
Moving machine parts.
Clinchfield Plant · 090005330 CFR 56.14107(a) · $267.00 proposed penalty
Examination of working places.
Clinchfield Plant · 090005330 CFR 56.18002(b) · $267.00 proposed penalty
Safe access.
Clinchfield Plant · 090005330 CFR 56.11001 · $267.00 proposed penalty
Dust control.
Clinchfield Plant · 090005330 CFR 56.9315 · Significant and substantial (S&S) · $959.00 proposed penalty
High-pressure hose connections.
Clinchfield Plant · 090005330 CFR 56.13021 · $267.00 proposed penalty
Inspection and cover plates.
Clinchfield Plant · 090005330 CFR 56.12032 · $313.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.