Stationary grinding machines.
Lyons Cement Plant Cemex Inc · 050034430 CFR 56.14115(a) · $313.00 proposed penalty
Moving machine parts.
Krome Quarry · 080101530 CFR 56.14107(a) · Significant and substantial (S&S) · $592.00 proposed penalty
Electrical conductors.
Krome Quarry · 080101530 CFR 56.12004 · Significant and substantial (S&S) · $1,320.00 proposed penalty
Impoundment Spot Inspection
Eliot Plant · 04018913.3 on-site hours reported
Regular Safety and Health Inspection
Lyons Cement Plant Cemex Inc · 0500344102.8 on-site hours reported
Regular Safety and Health Inspection
Krome Quarry · 080101527.0 on-site hours reported
Housekeeping.
Lyons Cement Plant Cemex Inc · 050034430 CFR 56.20003(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Housekeeping.
Lyons Cement Plant Cemex Inc · 050034430 CFR 56.20003(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Moving machine parts.
Lyons Cement Plant Cemex Inc · 050034430 CFR 56.14107(a) · $366.00 proposed penalty
Inspection and cover plates.
Krome Quarry · 080101530 CFR 56.12032 · $313.00 proposed penalty
Electrical conductors.
Krome Quarry · 080101530 CFR 56.12004 · $313.00 proposed penalty
Safe access.
Krome Quarry · 080101530 CFR 56.11001 · $151.00 proposed penalty
Machinery
Clinchfield Plant · 0900053No dys awy frm wrk,no rstr act
Accident narrative
Employee was getting ready for lunch when they felt something in their right eye, the employee was to the bathroom to flush eye out but was not able to get the material out of their eye. the employee was taken to a clinic where the material come out on its own. The employee was prescribed eye drops.
Regular Safety and Health Inspection
FEC QUARRY · 08005193.3 on-site hours reported
Verbal Hazard Complaint Inspections
FEC QUARRY · 080051924.8 on-site hours reported
Insulation and fittings for power wires and cables.
Brooksville South Cement Plant · 080128730 CFR 56.12008 · $642.00 proposed penalty
Moving machine parts.
Brooksville South Cement Plant · 080128730 CFR 56.14107(b) · $642.00 proposed penalty
Construction and maintenance of guards.
Brooksville South Cement Plant · 080128730 CFR 56.14112(b) · $642.00 proposed penalty
Housekeeping.
Brooksville South Cement Plant · 080128730 CFR 56.20003(a) · $2,503.00 proposed penalty
Dust control.
Brooksville South Cement Plant · 080128730 CFR 56.9315 · $642.00 proposed penalty
Barricades and warning signs.
Brooksville South Cement Plant · 080128730 CFR 56.20011 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Barricades and warning signs.
Brooksville South Cement Plant · 080128730 CFR 56.20011 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Waste receptacles.
Brooksville South Cement Plant · 080128730 CFR 56.20013 · $151.00 proposed penalty
Roll-over protective structures (ROPS) and seat belts.
Brooksville South Cement Plant · 080128730 CFR 56.14130(g) · Significant and substantial (S&S) · $165.00 proposed penalty
Construction and maintenance of guards.
Brooksville South Cement Plant · 080128730 CFR 56.14112(b) · $959.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.