Electrical conductors.
Dixie River Pit · 100200430 CFR 56.12004 · $151.00 proposed penalty
Regular Safety and Health Inspection
Mt Jordan Pit · 420094310.3 on-site hours reported
Electrical conductors.
Mt Jordan Pit · 420094330 CFR 56.12004 · Significant and substantial (S&S) · $1,550.00 proposed penalty
Regular Safety and Health Inspection
Suncore West Colorado · 05046805.0 on-site hours reported
Stepping or kneeling on object
Bauer Pit · 4202292Days restricted activity only
Accident narrative
Miner was walking and stepped on a rock, spraining EE's right ankle.
Impoundment Spot Inspection
Mt Jordan Pit · 42009435.0 on-site hours reported
Horns and backup alarms.
Airport Pit · 020122130 CFR 56.14132(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Airport Pit · 020122114.8 on-site hours reported
Regular Safety and Health Inspection
Morgan Pit · 42004057.0 on-site hours reported
Regular Safety and Health Inspection
Perry Pit · 42019353.5 on-site hours reported
Construction and maintenance of guards.
HANSEN PIT · 420210730 CFR 56.14112(b) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Electrical conductors.
HANSEN PIT · 420210730 CFR 56.12004 · Significant and substantial (S&S) · $5,144.00 proposed penalty
Regular Safety and Health Inspection
HANSEN PIT · 420210726.3 on-site hours reported
Electrical conductors.
HANSEN PIT · 420210730 CFR 56.12004 · $1,320.00 proposed penalty
Berms or guardrails.
HANSEN PIT · 420210730 CFR 56.9300(b) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Inspection and cover plates.
HANSEN PIT · 420210730 CFR 56.12032 · $592.00 proposed penalty
Regular Safety and Health Inspection
Thunder Material Source · 02033784.0 on-site hours reported
Regular Safety and Health Inspection
Pintura Pit · 42024966.0 on-site hours reported
New task training.
Pintura Pit · 420249630 CFR 46.7(a) · $168.00 proposed penalty
Regular Safety and Health Inspection
Crushing Plant · 020229211.0 on-site hours reported
Waste receptacles.
Crushing Plant · 020229230 CFR 56.20013 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Crushing Plant · 020229230 CFR 56.14100 · $151.00 proposed penalty
Distribution boxes.
Crushing Plant · 020229230 CFR 56.12006 · Significant and substantial (S&S) · $336.00 proposed penalty
First-aid materials.
Crushing Plant · 020229230 CFR 56.15001 · Significant and substantial (S&S) · $336.00 proposed penalty
Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.
Crushing Plant · 020229230 CFR 50.20(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.