← CBR Investments, LLC; CBR Investments II, LLC

CBR Investments, LLC; CBR Investments II, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Verbal Hazard Complaint Inspections

    inspectionRecord F005C1D
    Prairie Eagle-Underground · 1103147

    1.5 on-site hours reported

  2. Hazard training.

    violationRecord 9786520
    Prairie Eagle-Underground · 1103147

    30 CFR 48.31(a) · $336.00 proposed penalty

  3. Roof control plan.

    violationRecord 9781398
    Prairie Eagle-Underground · 1103147

    30 CFR 75.220(a)(1) · $336.00 proposed penalty

  4. Machinery and equipment; operation and maintenance.

    violationRecord 9786519
    Prairie Eagle-Underground · 1103147

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  5. Methane monitors.

    violationRecord 9786518
    Prairie Eagle-Underground · 1103147

    30 CFR 75.342(b)(2) · $245.00 proposed penalty

  6. Methane monitors.

    violationRecord 9786517
    Prairie Eagle-Underground · 1103147

    30 CFR 75.342(a)(4) · $165.00 proposed penalty

  7. Protection from falls of roof, face and ribs.

    violationRecord 9781397
    Prairie Eagle-Underground · 1103147

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  8. Mine ventilation plan; submission and approval.

    violationRecord 9786516
    Prairie Eagle-Underground · 1103147

    30 CFR 75.370(a)(1) · $398.00 proposed penalty

  9. Disorders (repeated trauma)

    accidentRecord 220251530006
    Prairie Eagle-Underground · 1103147

    Occupatnal illness not deg 1-6

    Accident narrative

    For past 6-7 months I.E. has been experiencing numbness in their hands. Also been losing grip. Doctor took the I.E. off for surgery on 5-30-2025.

  10. Escapeways; bituminous and lignite mines.

    violationRecord 9786720
    Prairie Eagle-Underground · 1103147

    30 CFR 75.380(d)(7)(vi) · $245.00 proposed penalty

  11. Accumulation of combustible materials.

    violationRecord 9786719
    Prairie Eagle-Underground · 1103147

    30 CFR 75.400 · $209.00 proposed penalty

  12. Drill dust control at underground areas of underground mines.

    violationRecord 9549739
    Prairie Eagle-Underground · 1103147

    30 CFR 72.630(b) · $366.00 proposed penalty

  13. Mine ventilation plan; submission and approval.

    violationRecord 9549738
    Prairie Eagle-Underground · 1103147

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  14. Drill dust control at underground areas of underground mines.

    violationRecord 9549737
    Prairie Eagle-Underground · 1103147

    30 CFR 72.630(b) · $366.00 proposed penalty

  15. Mine ventilation plan; submission and approval.

    violationRecord 9786718
    Prairie Eagle-Underground · 1103147

    30 CFR 75.370(a)(1) · $1,320.00 proposed penalty

  16. Protection from falls of roof, face and ribs.

    violationRecord 9786515
    Prairie Eagle-Underground · 1103147

    30 CFR 75.202(a) · $366.00 proposed penalty

  17. Automatic fire sensors and manual actuators; installation; minimum requirements.

    violationRecord 9786514
    Prairie Eagle-Underground · 1103147

    30 CFR 75.1107-4(c) · $226.00 proposed penalty

  18. Spot Inspections

    inspectionRecord 7006839
    Prairie Eagle-Underground · 1103147

    103(i) · 2.5 on-site hours reported

  19. Roof Control Technical Investigation

    inspectionRecord 7010568
    Prairie Eagle-Underground · 1103147

    37.5 on-site hours reported

  20. Maintenance of diesel-powered equipment.

    violationRecord 9786717
    Prairie Eagle-Underground · 1103147

    30 CFR 75.1914(a) · $245.00 proposed penalty

  21. Automatic fire sensor and warning device systems; examination and test requirements.

    violationRecord 9786141
    Prairie Eagle-Underground · 1103147

    30 CFR 75.1103-8(c) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  22. Automatic fire sensors.

    violationRecord 9786140
    Prairie Eagle-Underground · 1103147

    30 CFR 75.1103-1(b) · $549.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 9786139
    Prairie Eagle-Underground · 1103147

    30 CFR 75.400 · Significant and substantial (S&S) · $2,312.00 proposed penalty

  24. Accumulation of combustible materials.

    violationRecord 9786138
    Prairie Eagle-Underground · 1103147

    30 CFR 75.400 · $465.00 proposed penalty

  25. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 9786137
    Prairie Eagle-Underground · 1103147

    30 CFR 75.1106-3(a)(2) · $226.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.