Carmeuse Holding SA safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Controls and switches.
Dixon Rd. · 200342730 CFR 56.12002 · $151.00 proposed penalty
Safe access.
LONGVIEW OPERATION · 010039430 CFR 56.11001 · Significant and substantial (S&S) · $432.00 proposed penalty
Safety defects; examination, correction and records.
LONGVIEW OPERATION · 010039430 CFR 56.14100(a) · $336.00 proposed penalty
Regular Safety and Health Inspection
LONGVIEW OPERATION · 010039449.3 on-site hours reported
High-pressure hose connections.
Underground Black River Operation · 150006230 CFR 57.13021 · $151.00 proposed penalty
Testing grounding systems.
Underground Black River Operation · 150006230 CFR 57.12028 · $151.00 proposed penalty
Illumination of surface working areas.
Underground Black River Operation · 150006230 CFR 57.17001 · $151.00 proposed penalty
Moving machine parts.
Underground Black River Operation · 150006230 CFR 57.14107(b) · Significant and substantial (S&S) · $883.00 proposed penalty
Safety defects; examination, correction and records.
Underground Black River Operation · 150006230 CFR 57.14100(b) · $151.00 proposed penalty
Restricted clearance.
Underground Black River Operation · 150006230 CFR 57.11008 · $151.00 proposed penalty
Construction and maintenance of guards.
Underground Black River Operation · 150006230 CFR 57.14112(a)(1) · Significant and substantial (S&S) · $398.00 proposed penalty
Inspection and cover plates.
Underground Black River Operation · 150006230 CFR 57.12032 · Significant and substantial (S&S) · $267.00 proposed penalty
Toilet facilities.
Underground Black River Operation · 150006230 CFR 57.20008(a) · $151.00 proposed penalty
Operators' stations.
Underground Black River Operation · 150006230 CFR 57.14103(b) · $151.00 proposed penalty
Construction and maintenance of guards.
Underground Black River Operation · 150006230 CFR 57.14112(b) · Significant and substantial (S&S) · $398.00 proposed penalty
Safe access.
Underground Black River Operation · 150006230 CFR 57.11001 · $226.00 proposed penalty
Exits for surface buildings and structures.
Underground Black River Operation · 150006230 CFR 57.4530 · $151.00 proposed penalty
Testing grounding systems.
Underground Black River Operation · 150006230 CFR 57.12028 · $151.00 proposed penalty
Moving machine parts.
Underground Black River Operation · 150006230 CFR 57.14107(a) · $151.00 proposed penalty
Testing grounding systems.
Underground Black River Operation · 150006230 CFR 57.12028 · $151.00 proposed penalty
Housekeeping.
Underground Black River Operation · 150006230 CFR 57.20003(a) · $151.00 proposed penalty
Battery-charging stations.
Underground Black River Operation · 150006230 CFR 57.4502(c) · $151.00 proposed penalty
Electrical conductors.
Underground Black River Operation · 150006230 CFR 57.12004 · $151.00 proposed penalty
Operators' stations.
Underground Black River Operation · 150006230 CFR 57.14103(b) · $151.00 proposed penalty
Handling of materials
Chesney Underground · 4002113Days away from work only
Accident narrative
Employee noticed lime burns to both wrists as they deconned their PPE for their lunch break. Employee reported injury to safety rep., treated by clinic per company policy, placed on light duty, and prescribed antibiotics on 7-16-2026 as a preventative measure for the burns in-case it was to become infected.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.