Regular Safety and Health Inspection
Poteet Plant · 41054152.3 on-site hours reported
Regular Safety and Health Inspection
Poteet Plant · 41054151.3 on-site hours reported
Spot Inspection
Poteet Plant · 41054150.8 on-site hours reported
Address of record and telephone number.
Poteet Plant · 410541530 CFR 41.30 · $151.00 proposed penalty
Changes; notification by operator.
Poteet Plant · 410541530 CFR 41.12 · $151.00 proposed penalty
Housekeeping.
Poteet Plant · 410541530 CFR 56.20003(c) · Significant and substantial (S&S) · $1,320.00 proposed penalty
High-pressure hose connections.
Poteet Plant · 410541530 CFR 56.13021 · $267.00 proposed penalty
Housekeeping.
Poteet Plant · 410541530 CFR 56.20003(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Safe access.
Poteet Plant · 410541530 CFR 56.11001 · Significant and substantial (S&S) · $1,320.00 proposed penalty
Inspection.
Poteet Plant · 410541530 CFR 56.4201(a)(1) · $267.00 proposed penalty
Inspection.
Poteet Plant · 410541530 CFR 56.4201(a)(2) · $267.00 proposed penalty
Regular Safety and Health Inspection
Poteet Plant · 410541512.8 on-site hours reported
Air receiver tanks.
Poteet Plant · 410541530 CFR 56.13011 · $267.00 proposed penalty
High-pressure hose connections.
Poteet Plant · 410541530 CFR 56.13021 · $267.00 proposed penalty
Construction and maintenance of guards.
Poteet Plant · 410541530 CFR 56.14112(b) · $267.00 proposed penalty
Work on electrically-powered equipment.
Poteet Plant · 410541530 CFR 56.12016 · $267.00 proposed penalty
Inspection and cover plates.
Poteet Plant · 410541530 CFR 56.12032 · $4,383.00 proposed penalty
Inspection and cover plates.
Poteet Plant · 410541530 CFR 56.12032 · $1,320.00 proposed penalty
Moving machine parts.
Poteet Plant · 410541530 CFR 56.14107(a) · $267.00 proposed penalty
Work on electrically-powered equipment.
Poteet Plant · 410541530 CFR 56.12016 · $267.00 proposed penalty
Distribution boxes.
Poteet Plant · 410541530 CFR 56.12006 · $883.00 proposed penalty
Parking procedures for unattended equipment.
Poteet Plant · 410541530 CFR 56.14207 · $883.00 proposed penalty
Safety defects; examination, correction and records.
Poteet Plant · 410541530 CFR 56.14100(a) · Significant and substantial (S&S) · $14,557.00 proposed penalty
Brakes.
Poteet Plant · 410541530 CFR 56.14101(a)(3) · $14,557.00 proposed penalty
Correction of dangerous conditions.
Poteet Plant · 410541530 CFR 56.12030 · $267.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.